EAA Builders Log Website
EMail address:
Password:
- Lost my password
close
EAA Builders Log
(An EAA website).
Help
Contact Us
About
Sign Up
Login
Project:
ToddsCH650B
-
Listing for Category : rghtwingflap
(Please mouse-over any icon to get a description of that function).
Categories
Show All Entries
- (92)
Elevator
- (8)
Engine
- (4)
Firewall
- (6)
CabinFloor
- (6)
H-Stabilizer
- (10)
LeftAileron
- (4)
LeftWingFlap
- (3)
LtRrFuseSide
- (6)
RearFuselage
- (11)
RearLowrFuse
- (13)
RghtWingFlap
- (4)
RightAileron
- (3)
RtRrFuseSide
- (6)
Rudder
- (7)
None
- (1)
Builder Name:
Todd Osborne
-
Project:
Zenair - CH 650 B
-
VIEW REPORTS
Total Hours:
231
Start/Last Date:
Nov 18, 2017 - Dec 20, 2020
Engine:
Corvair
Propeller:
TBD
Panel:
GlassPack (Custom)
Friendly URL:
https://eaabuilderslog.org?s=ToddsCH650B
Home or Last Project Picture
Dec 11, 2018
Final Assembly
- (2 hours)
Category: RghtWingFlap
Dec 10, 2018
Priming
- (1 hour)
Category: RghtWingFlap
Alumiprep 33 and Alodine 1201 and Zinc Phosphate
0001.jpg
0002.jpg
0003.jpg
0004.jpg
0005.jpg
Dec 08, 2018
Assembly
- (5 hours)
Category: RghtWingFlap
Pilot drilled and cleco'd ribs to skin, installed hinge, final drilled everything, disassembled and deburred
Dec 06, 2018
Drill Ribs
- (2 hours)
Category: RghtWingFlap
Measured, drilled, and cut nylon control plates and layed out and drilled ribs
NOTE: This information is strictly used for the EAA Builders Log project within the
EAA organization
.
-
Policy
-
© Copyright 2024 Brevard Web Pro, Inc.