Project: ToddsCH650B   -  
            Listing for Category : leftaileron
    (Please mouse-over any icon to get a description of that function).


  
Builder Name:Todd Osborne   -  
Project:   Zenair - CH 650 B   -   VIEW REPORTS
Total Hours:231
Start/Last Date:Nov 18, 2017 - Dec 20, 2020
Engine:Corvair
Propeller:TBD
Panel:GlassPack (Custom)
 
Friendly URL: https://eaabuilderslog.org?s=ToddsCH650B

Home or Last Project Picture

Dec 20, 2018     Final Assembly - (2 hours) Category: LeftAileron
Final assembly and riveting
 
Dec 19, 2018     Drilling and Priming - (3 hours)       Category: LeftAileron
Final drilled all holes. Disassemble, debur, and clean. AlumiPrep and Alodine, and Zinc Phosphate primer.


 
Dec 18, 2018     Assembly - (5 hours)       Category: LeftAileron
Started "B" model updates, including fitting and drilling gussets, drilling holes for new ribs, and started laying out mass balanced aileron rods. Pilot drilled balance aileron rod to ribs. Started installing inside skin. Finished pilot drilling balance arm ribs and riveted horn.


 
Dec 17, 2018     Started - (2 hours) Category: LeftAileron
Drilling and shaping horns for both ailerons. Pilot drill ribs, tip, and main rivet line. This is what used to be a complete aileron, less the horn, but is now superseded by the "B" modifications that include 2 extra ribs, balance shaft and weights, and 2 gussets. Those will be installed next.
 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.