EAA Builders Log Website
EMail address:
Password:
- Lost my password
close
EAA Builders Log
(An EAA website).
Help
Contact Us
About
Sign Up
Login
Project:
ToddsCH650B
-
Listing for Category : rtrrfuseside
(Please mouse-over any icon to get a description of that function).
Categories
Show All Entries
- (92)
Elevator
- (8)
Engine
- (4)
Firewall
- (6)
CabinFloor
- (6)
H-Stabilizer
- (10)
LeftAileron
- (4)
LeftWingFlap
- (3)
LtRrFuseSide
- (6)
RearFuselage
- (11)
RearLowrFuse
- (13)
RghtWingFlap
- (4)
RightAileron
- (3)
RtRrFuseSide
- (6)
Rudder
- (7)
None
- (1)
Builder Name:
Todd Osborne
-
Project:
Zenair - CH 650 B
-
VIEW REPORTS
Total Hours:
231
Start/Last Date:
Nov 18, 2017 - Dec 20, 2020
Engine:
Corvair
Propeller:
TBD
Panel:
GlassPack (Custom)
Friendly URL:
https://eaabuilderslog.org?s=ToddsCH650B
Home or Last Project Picture
Feb 02, 2019
Final Assembly
- (5 hours)
Category: RtRrFuseSide
Remove, debur, and prime L's. Debur and prime side skin. Final assembly and riveting.
0001.jpg
0002.jpg
0003.jpg
0004.jpg
Jan 29, 2019
Drilling
- (1 hour)
Category: RtRrFuseSide
Pilot and final drilling side to bottom frame
Jan 27, 2019
Panel Positioning
- (1 hour)
Category: RtRrFuseSide
Started positioning panel on lower fuselage
0001.jpg
0002.jpg
0003.jpg
Jan 27, 2019
Drilling
- (1 hour)
Category: RtRrFuseSide
Final-size hole drilling on L's
Jan 20, 2019
L's
- (1 hour)
Category: RtRrFuseSide
Pilot drilling L's
0001.jpg
Jan 19, 2019
Started
- (5 hours)
Category: RtRrFuseSide
Installing and pilot drilling L's
NOTE: This information is strictly used for the EAA Builders Log project within the
EAA organization
.
-
Policy
-
© Copyright 2024 Brevard Web Pro, Inc.