Project: ToddsCH650B   -  
            Listing for Category : firewall
    (Please mouse-over any icon to get a description of that function).


  
Builder Name:Todd Osborne   -  
Project:   Zenair - CH 650 B   -   VIEW REPORTS
Total Hours:231
Start/Last Date:Nov 18, 2017 - Dec 20, 2020
Engine:Corvair
Propeller:TBD
Panel:GlassPack (Custom)
 
Friendly URL: https://eaabuilderslog.org?s=ToddsCH650B

Home or Last Project Picture

Jan 18, 2019     Completed - (3 hours)       Category: Firewall
Install lower section, including sliders, replaced upper doubler, sprayed Nason primer, reassembled, riveted, and bolted bearing


 
Jan 17, 2019     Started - (2 hours) Category: Firewall
Countersinking holes for firewall lower support, hand riveting parts that could not be done with pneumatic riveter, trimming sliders
 
Jan 04, 2019     Assembly - (3 hours)       Category: Firewall
Assembly and riveting. Need to order hand riveter to get into tight spots, and still waiting for replacement doubler.


 
Jan 03, 2019     Assembly - (4 hours)       Category: Firewall
Final drilling and fitting and sticker removal. Deburring components, all but firewall steel itself. AlumiPrep and Alodine. Spray Zinc Phosphate. Deburring main firewall metal.


 
Jan 02, 2019     Assembly - (3 hours)       Category: Firewall
Drilled and fit back stiffeners. Drilled and fit center stiffeners, disassembled. Almost ready for deburring and corrosion protection.


 
Jan 01, 2019     Started - (4 hours)       Category: Firewall
Started drilling bottom and top stiffeners. Top stiffener and doubler. Completed drilling of side stiffeners.


 