Project: FloMoSlingTSi   -  
            Listing of Entries
    (Please mouse-over any icon to get a description of that function).


  
Builder Name:Aaron Garinger   -  
Project:   The Airplane Factory - Sling TSi
Total Hours:1061
Total Flight Time:
Start/Last Date:Dec 01, 2019 - No Finish Date
Engine:Rotax 915iS
Propeller:Airmaster Constant Speed Prop
Panel:Garmin
 
Friendly URL: https://eaabuilderslog.org?s=FloMoSlingTSi

Home or Last Project Picture

Jan 15, 2020     HS Finished Dimpling - (2 hours)       Category: Empennage
Finished dimpling the HS ribs - specifically those that required using the hand squeezer for difficult to reach holes with DRDT-2. Had to grind down the dimple dies more and grind down the lower edge of the hand squeezer so that it would not mar the inside wall of the smaller rib parts. Ground it down for the same clearance as the lower dimple die.


 