Project: FloMoSlingTSi   -  
            Listing of Entries
    (Please mouse-over any icon to get a description of that function).


  
Builder Name:Aaron Garinger   -  
Project:   The Airplane Factory - Sling TSi
Total Hours:1061
Total Flight Time:
Start/Last Date:Dec 01, 2019 - No Finish Date
Engine:Rotax 915iS
Propeller:Airmaster Constant Speed Prop
Panel:Garmin
 
Friendly URL: https://eaabuilderslog.org?s=FloMoSlingTSi

Home or Last Project Picture

Jan 19, 2020     HS Skin Fitting and Upsize Drilling - (4 hours)       Category: Empennage
Fit both the left and right skins to the HS. It took a couple of tries on both sides to get the pre-punched holes to line up and be clecoed.

Began match drilling the skins/ribs for the countersunk rivet holes up to the needed 3.2mm size (pre-punched holes are at 2.8mm).


 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.