Checked alignment with laser level.
Finished match drilling the skins/ribs for the countersunk rivet holes up to the needed 3.2mm size (pre-punched holes are at 2.8mm). Used #30 chucking reamer bit.
Disassembled, removed any final burrs and cleaned up metal shavings from drilling.
Ready for priming.