Project: FloMoSlingTSi   -  
            Listing of Entries
    (Please mouse-over any icon to get a description of that function).


  
Builder Name:Aaron Garinger   -  
Project:   The Airplane Factory - Sling TSi
Total Hours:1061
Total Flight Time:
Start/Last Date:Dec 01, 2019 - No Finish Date
Engine:Rotax 915iS
Propeller:Airmaster Constant Speed Prop
Panel:Garmin
 
Friendly URL: https://eaabuilderslog.org?s=FloMoSlingTSi

Home or Last Project Picture

Mar 06, 2020     EL End Tips - (3 hours)       Category: Empennage
Put on the elevator tips and drilled top and bottom of left side after several cycles of test fitting. Rather than using 3.2mm drill bit for 10 countersunk holes, used 2.4mm so that microstop countersink cutter would not wonder in the hole and therefore used silver cleco's along the way of drilling end piece. Did use 3.2mm drill bit on non-countersink holes.

It was a beautiful spring-like day in Texas so took advantage and worked with the garage door open.


 