Project: FloMoSlingTSi   -  
            Listing of Entries
    (Please mouse-over any icon to get a description of that function).


  
Builder Name:Aaron Garinger   -  
Project:   The Airplane Factory - Sling TSi
Total Hours:1045
Total Flight Time:
Start/Last Date:Dec 01, 2019 - No Finish Date
Engine:Rotax 915iS
Propeller:Airmaster Constant Speed Prop
Panel:Garmin
 
Friendly URL: https://eaabuilderslog.org?s=FloMoSlingTSi

Home or Last Project Picture

Oct 24, 2020     VS Skin - (6 hours)       Category: Empennage
Drilled two pilot holes 18mm from rivet line centers on top of VS and 8mm apart to accommodate V style VOR antenna. Upsize drilled the holes to 9.5mm and hand filed the holes to be an oval shape. Performed same on both sides of skin. Used a sharpie to draw a line around puck elements so can tell they are fully seated when screwed in once skin is attached. Torqued the antenna puck to appropriate value. The M4 x12mm stainless bolts were replaced with M4 x 40mm stainless for length through the spacer and puck (page E 3.5). After ordering several sizes of grommets from Aircraft Spruce to trial, went with part # AN931-6-10.
Attached skin and checked alignment with laser level.


 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.