Project: FloMoSlingTSi   -  
            Listing of Entries
    (Please mouse-over any icon to get a description of that function).


  
Builder Name:Aaron Garinger   -  
Project:   The Airplane Factory - Sling TSi
Total Hours:1061
Total Flight Time:
Start/Last Date:Dec 01, 2019 - No Finish Date
Engine:Rotax 915iS
Propeller:Airmaster Constant Speed Prop
Panel:Garmin
 
Friendly URL: https://eaabuilderslog.org?s=FloMoSlingTSi

Home or Last Project Picture

Dec 03, 2020     EL Rivet Prep - (4 hours)       Category: Empennage
Had to do a little rework to drill out the end counter weights and change from 4.0 to 4.8 size rivets. The holes in the rib have to be upsized and the counter weight slightly drilled out to accept the 4.8 x 15mm rivets.

Attached the elevator the the horiz stab with bolts temporarily to check alignment and fit. Prepared elevator with all clecos for riveting as next step.

For the elevator composite tips, created some aluminum straps for inside to reduce the chance of a rivet pulling through the composite hole (especially the front ones which are countersinked).


 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.