Project: FloMoSlingTSi   -  
            Listing of Entries
    (Please mouse-over any icon to get a description of that function).


  
Builder Name:Aaron Garinger   -  
Project:   The Airplane Factory - Sling TSi
Total Hours:1061
Total Flight Time:
Start/Last Date:Dec 01, 2019 - No Finish Date
Engine:Rotax 915iS
Propeller:Airmaster Constant Speed Prop
Panel:Garmin
 
Friendly URL: https://eaabuilderslog.org?s=FloMoSlingTSi

Home or Last Project Picture

Feb 24, 2020     HS Skins Riveting - (4.5 hours)       Category: Empennage
Riveted the left HS skin in place. Had to ream out a few holes along bottom trailing edge. Took extra time to ensure rivets grabbed correctly for the two smaller leading edge ribs as these were more difficult to get the holes aligned correctly when installing clecos. Also check that front spar channel center angle (third layer) was seated properly when rivet installed vs being pushed down. The inexpensive borescope was very helpful to look inside the structure once the skins were already cleco'd (https://www.amazon.com/gp/product/B07ZVF6HX5/ref=ppx_yo_dt_b_asin_title_o07_s00?ie=UTF8&psc=1).


 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.