EAA Builders Log Website
EMail address:
Password:
- Lost my password
close
EAA Builders Log
(An EAA website).
Help
Contact Us
About
Sign Up
Login
Project:
N122B
-
Listing for Category : firewall
(Please mouse-over any icon to get a description of that function).
Categories
Show All Entries
- (201)
Research
Workshop
- (1)
Empennage
- (16)
Fuselage
- (36)
Firewall
- (4)
Tail Feathers
Wings
- (30)
Controls
- (8)
Avionics
- (17)
Lighting
- (2)
Instrument Panel
- (1)
Landing Gear
- (7)
Engine
- (11)
Propeller
- (5)
Fuel System
- (8)
Interior Finish
- (2)
Paint / Decals
- (6)
Inspection
- (2)
Tools
Canopy
- (23)
Cowl
- (8)
Assembly
- (13)
Flight
- (1)
Builder Name:
Barry Bernstein
-
Project:
Vans - RV-12iS
-
VIEW REPORTS
Total Hours:
Start/Last Date:
Dec 17, 2019 - Oct 22, 2020
Engine:
Rotax 912iS
Panel:
Garmin G3X touch
Friendly URL:
https://eaabuilderslog.org?s=N122B
Home or Last Project Picture
Jun 16, 2020
Heater vent installation
Category: Firewall
Assembled and installed heater vents. Working with stainless steel is a real challenge, especially after aluminum!
IMG_0993.jpeg
IMG_0994.jpeg
IMG_0995.jpeg
May 19, 2020
Pro seal fun
Category: Firewall
Riveted battery box and oil tank mount to firewall. Sealed lower edge of canopy rib with pro seal. Masked rivet heads and applied pro seal per instructions. Messy, sticky and stinky.
IMG_0859.jpeg
IMG_0861.jpeg
IMG_0862.jpeg
IMG_0863.jpeg
May 18, 2020
Upper firewall and avionics bay
Category: Firewall
Riveted avionics bay floor and canopy ribs to firewall and longerons. Fitted battery box and oil tank brackets to firewall.
IMG_0858.jpeg
IMG_0857.jpeg
May 15, 2020
Upper firewall and avionics bay
Category: Firewall
Prepped avionics bay floor and side panels. Canopy attach points also completed and riveted in place.
IMG_0849.jpeg
IMG_0851.jpeg
NOTE: This information is strictly used for the EAA Builders Log project within the
EAA organization
.
-
Policy
-
© Copyright 2024 Brevard Web Pro, Inc.