Began assembly of the center section bulkhead. Added side bulkhead and parts preparation (nut plate installation, countersinking and match drilling). The plans called for match drilling a number of holes that were already machine punched. These kit upgrades shortened the process considerably.
Pulling the cherrymax rivets was challenging. With either my electric rivet or hand puller, mandrels broke prematurely, despite rivet lubrication per Vans instructions. Will need to order replacement rivets and will try using a branded cherrymax rivet puller.
ELT bracket assembled and baggage compartment floor riveted to the center bulkhead. Due to limited space for the hand riveter, thin, flat sets (per the KAI) were used to squeeze the universal head rivets. Worked well.