Project: N122B   -  
            Listing for Category : landing gear
    (Please mouse-over any icon to get a description of that function).


  
Builder Name:Barry Bernstein   -  
Project:   Vans - RV-12iS   -   VIEW REPORTS
Total Hours:
Start/Last Date:Dec 17, 2019 - Oct 22, 2020
Engine:Rotax 912iS
Panel:Garmin G3X touch
 
Friendly URL: https://eaabuilderslog.org?s=N122B

Home or Last Project Picture

Mar 28, 2021     Speed mods       Category: Landing Gear
Changed nose wheel fairing attach screws to countersunk/flat head with countersunk washers. Will need to perform appropriate flight testing to determine impact on fuel consumption and airspeed.


 
Jul 19, 2020     Landing gear closeout and CO detector       Category: Landing Gear
Completed installation of rubber landing gear closeouts. Not airtight, but should help. Wired and mounted CO detector.


 
Jul 09, 2020     On the gear!       Category: Landing Gear
Completed the condition inspection for N12BB in preparation for sale. Addressing all service bulletins, including the nose gear replacement added substantial time to the inspection. Now complete, I'm back at work on N122B. Mounted nose gear, fork and tire/wheel assembly to fuselage. Lowered to floor. Each wheel sits on dolly, allowing the fuselage to be rolled in any direction.


 
Jun 26, 2020     Shims       Category: Landing Gear
Added shims to correct toe in/toe out. Rechecked using blocks and string per KAI. Reassembled brakes and wheels. Assembled tow bar. Awaiting nose gear and engine mount.


 
Jun 23, 2020     Mounting axles, wheels and tires.       Category: Landing Gear
Final torqued right main gear. Connected brake line. This was very difficult due to limited access. Next plane will connect prior to installing gear leg. Added axles and checked alignment. Left axle has <0.5 degree toe in, however, right axle has 0.5 degree toe out. This will require a shim to align properly (no toe out). Went ahead and installed brake line/fittings. Greased bearings. Balanced and mounted tires.


 
Jun 22, 2020     Legs       Category: Landing Gear
Final torqued right landing gear leg bolts and connected brake line. Note the brake line fitting was installed while the gear leg was still on the workbench for easier access. Fitted left gear leg/wear plates.


 
Jun 21, 2020     Initial fitting of right gear leg       Category: Landing Gear
Primed landing gear wear plates and doubler. Pipe thread fitting for brakes installed in landing gear. Assembly installed (final tightening/torque) of bolts to be completed.


 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.