Project: Voltar-S21   -  
            Listing for Category : inspection
    (Please mouse-over any icon to get a description of that function).


  
Builder Name:Vern Little   -  
Project:   Rans - S-21 Outbound   -   VIEW REPORTS
Total Hours:2315.8
Start/Last Date:Mar 06, 2018 - No Finish Date
 
Friendly URL: https://eaabuilderslog.org?s=Voltar-S21

Home or Last Project Picture

Apr 16, 2021     MD-RA Inspection - (3 hours)       Category: Inspection
Completed my box-section inspection by the MD-RA. No snags: elevator, HS, VS, rudder, flaps, ailerons, wings and fuselage. Received my S/S dataplate and paperwork.

Issues I asked about:
1, Nordlock washers on the brake caliper bolts- recommended drilled head bolts and safety wire, but a Cessna 340 he had just worked on has neither!
2. Lack of fuel tank drains. He would have preferred wing tank drains, but will accept the single drain in the header tank as acceptable. The design of the wing tanks have several low points (water traps) that cannot be drained, so the header tank is the solution.


 
Apr 14, 2021     Cleaning and settup up for inspection - (3 hours) Category: Inspection
Organized hangar, retrieved HS and Elevator from storage racks and put on workbench for inspection. Left control surfaces on wings for inspection. Most box sections are left open for the MD-RA inspector.
 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.