Project: Voltar-S21   -  
            Listing for Category : lighting
    (Please mouse-over any icon to get a description of that function).


  
Builder Name:Vern Little   -  
Project:   Rans - S-21 Outbound   -   VIEW REPORTS
Total Hours:2315.8
Start/Last Date:Mar 06, 2018 - No Finish Date
 
Friendly URL: https://eaabuilderslog.org?s=Voltar-S21

Home or Last Project Picture

Mar 30, 2024     Rewired Wing Wiring - (2.5 hours)       Category: Lighting
Back to work after 4 months. Converted the main junction of the left and right wing wiring to a terminal block. This should provide a more elegant and maintainable wiring nexus.

I calculated that a 12–position terminal block was required, and so it was. Available from Amazon: search for Terminal Block and Strip 12 Position 600V 15A Dual Row Screw Terminals Strip. Comes with shorting bars which can be cut down to size.


 
Apr 06, 2021     Pulling wing wires - (1.0 hour) Category: Lighting
Strung pitot and landing light wires in wings.
 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.