Project: Voltar-S21   -  
            Listing for Category : propeller
    (Please mouse-over any icon to get a description of that function).


  
Builder Name:Vern Little   -  
Project:   Rans - S-21 Outbound   -   VIEW REPORTS
Total Hours:2315.8
Start/Last Date:Mar 06, 2018 - No Finish Date
 
Friendly URL: https://eaabuilderslog.org?s=Voltar-S21

Home or Last Project Picture

Apr 20, 2024     Spinner - (3.1 hours)       Category: Propeller
Drilled and attached #3 nutplates for spinner attachment. Also attached #6 nutplates for filler plate. Need to use 4-40 or 6-32 screws for aft filler plate attachment.

I need to improve the filler plate fit with some fiberglass work.


 
Apr 19, 2024     Spinner Filler Plates - (3.5 hours)       Category: Propeller
Used JB Weld and NAS1097 rivets to attach flanges to spinner filler plates.
Inventoried windscreen and skylight parts.


 
Apr 17, 2024     Spinner - (2.5 hours)       Category: Propeller
Checked spinner alignment and pilot drilled the 10 mounting holes #40. Fabricated filler plates, which will be mounted to backplate with screws (allows removing for paint) and to the spinner with #8 screws.

Filler plates will have flanges bonded on the inside so they can be attached to the spinner. Using the material cut out to fabricate the flanges.


 
Apr 08, 2024     Blade Install - (3.0 hours)       Category: Propeller
Installed propeller blades and clocked to 18 degrees pitch.


 
Apr 06, 2024     2.0 - (2.0 hours)       Category: Propeller
Mounted propeller hub. Torqued and safety wired prop extension.


 