Project: Voltar-S21   -  
            Listing for Category : research
    (Please mouse-over any icon to get a description of that function).


  
Builder Name:Vern Little   -  
Project:   Rans - S-21 Outbound   -   VIEW REPORTS
Total Hours:2315.8
Start/Last Date:Mar 06, 2018 - No Finish Date
 
Friendly URL: https://eaabuilderslog.org?s=Voltar-S21

Home or Last Project Picture

Mar 06, 2025     About       Category: Research
Here I am with my Harmon Rocket II, Voltar. Don't let this confuse you, because I am building an S-21!

Below is my RV-9A flirting with the Rocket.


 
Feb 01, 2024     Additional Parts - (.1 hour) Category: Research
Ordering extra rivets
 
Jul 05, 2023     Baffle Seals - (3.5 hours) Category: Research
Fitting baffle seals. Need to cut oil filler door to allow for detailed fitting.
 
Jul 04, 2023     Baffle Seals - (2.0 hours) Category: Research
Fabricated more baffle seal backing strips and started to fit flexible seals.
 
Jun 29, 2023     Putting thing in Perspective       Category: Research
Doing some research on Baffling while watching TV… my nephew was just drafted by the NHL Anaheim Ducks! Hockey has always been my 3rd rail, after Electronics and Airplanes. Yeah! Nico Myatovic. First player in the second round, #33 overall.


 
Apr 02, 2023     On hold Category: Research
Project temporarily on hold.
 
Nov 01, 2022     Wiring Mods - (3 hours) Category: Research
Fabricated wiring harnesses for downtube power/data jacks. This will allow devices to be mounted in the line of sight, such as an OnSpeed display.

 
Oct 31, 2022     Downed Tools       Category: Research
Project on hold... waiting for an engine and some parts for options/upgrades to the kit.
The photos show a design I did in 2022... and another design from 1982.


 
Mar 06, 2021     Three years! Category: Research
Three years and counting.....
 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.