Project: wlawrence   -  
            Listing for Category : workshop
    (Please mouse-over any icon to get a description of that function).


  
Builder Name:William Lawrence   -  
Project:   Sonex   -   VIEW REPORTS
Total Hours:1884.3
Total Flight Time:
Start/Last Date:Nov 21, 2018 - No Finish Date
Engine:Aerovee
 
Friendly URL: https://eaabuilderslog.org?s=wlawrence

Home or Last Project Picture

Jan 22, 2022     Shadow Board and Plans stand       Category: Workshop
A place to lay out the plans and hang tools, plus it protects my hangar mate's car.


 
Jul 31, 2021     Continue Assembling Hardware For New Owner To Be Able To Finish Assembling Aircraft - (8 hours)       Category: Workshop
Lee Teicheira and Bill Lawrence continued referencing the plans to determine additional hardware needed to complete the project build, assembling the necessary pieces, bagging and labeling such and sorting the bags for rapid transfer to the new project owner. In addition, we sorted and organized some additional hardware for the shop.


 
Jul 28, 2021     Continue Assembling Hardware For New Owner To Be Able To Finish Assembling Aircraft - (3.8 hours)       Category: Workshop
Lee Teicheira and Bill Lawrence continued checking the plans for hardware requirements necessary for new owner to finish assembling the aircraft, collecting and labeling that hardware that is in inventory and gathering together for new owner.


 
Jul 27, 2021     Begin Gathering Materials To Go With The Project When It Is Sold - (4 hours)       Category: Workshop
Lee Teicheira and Bill Lawrence began gathering materials and pieces that have not yet been installed on the aircraft due to awaiting transfer to new location by new owner and inspection for airworthiness certification.


 
Mar 20, 2021     Rearrange Workshop In Preparation For Installing Wings - (4 hours)       Category: Workshop
Lee Teicheira and Bill Lawrence rearranged the workshop to accommodate the installation of the wings.


 
Jan 26, 2021     Rearrange Shop - (4 hours)       Category: Workshop
At a standstill waiting for parts and pieces to arrive, Lee Teicheira and Bill Lawrence rearranged the shop to make it more work friendly and did some cleaning up.


 
Jun 14, 2020     Reorganize Shop - (9 hours)       Category: Workshop
Reorganize shop to accommodate additional Kitfox and Bearhawk projects.


 
Feb 07, 2019     Organizing the Sonex workshop - (10 hours)       Category: Workshop
Organizing the Sonex workshop and inspecting the project after the project arrives.

The original builder had some novel ideas and features, like SDS EFI, a four into one exhaust, that the Chapter 393 brain trust felt brought too much risk to the project, both from a flight safety and a marketing standpoint. Back to the Plans was the operative philosophy during the Chapter's stewardship of this project.


 
Feb 02, 2019     Transporting project to workshop - (6 hours)       Category: Workshop
Transported Don Baldwin Sonex project from Tracy Peters hangar to Sonex hangar.

RRY note: look at how the cowling had to be chopped up to accommodate the fuel injection plumbing! The chapter bought a new cowling (or one came with another Sonex project that was donated, not sure which it was).


 