Project: wlawrence   -  
            Listing for Category : avionics
    (Please mouse-over any icon to get a description of that function).


  
Builder Name:William Lawrence   -  
Project:   Sonex   -   VIEW REPORTS
Total Hours:1884.3
Total Flight Time:
Start/Last Date:Nov 21, 2018 - No Finish Date
Engine:Aerovee
 
Friendly URL: https://eaabuilderslog.org?s=wlawrence

Home or Last Project Picture

Feb 16, 2024     Pitot Static and Mode C check       Category: Avionics
Had James from Direct Avionics come over to do my required checks to operate in the Mode C veil. There were some leaks at the Air Data Computer, which tightening the fittings cured.

Also pulled the wing tip lights to allow installation of the shims.

James let me know the Garmin ADSB Out unit will need to be programmed via a laptop and a USB connection to reflect my N-number and ownership. I have no idea whether the USB port is accessible or if I need to pull the panel apart, AGAIN.


 
Jan 16, 2023     Labeling, cleanup, skins       Category: Avionics
Replaced temporary labels on blue tape with proper Klein wire labels.
Vacuumed up swarf from fuselage nooks and crannies.
With fear and trembling, tested SANDING the residue of the 20 year old protective film from the flaps and ailerons. Started with 320 - yes, it leaves swirls, but it cuts the crud, and leaves a nice matte finish, that 600 grit further refines. I'm going to use this on the TOP of the control surfaces before First Flight.


 
May 22, 2021     Continue Work On Engine and Avionics Wiring and Connections - (6 hours)       Category: Avionics
Mark Ausman and John Koehler worked on completing the engine and avionics wiring and connections.


 
Nov 15, 2020     Replacement of Pitot Static Line Tube - (4.5 hours)       Category: Avionics
Lee Teicheira, Harvard and Sara Holmes work on replacing pitot static line tube with correct tube material.


 
Oct 31, 2020     Continue Wiring and Testing of Avionics - (6 hours)       Category: Avionics
Marc Ausman, John Koehler and Harvard Holmes continue connecting wiring and testing avionics.


 
Sep 26, 2020     Connect Engine Wiring - (6 hours)       Category: Avionics
Marc Ausman and John Koehler connect engine wiring for EFIS and reconnect wingtip position and strobe lights.


 
Sep 25, 2019     Install Auto Pilot Servo in Aircraft - (3 hours)       Category: Avionics


 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.