Project: wlawrence   -  
            Listing for Category : instrument panel
    (Please mouse-over any icon to get a description of that function).


  
Builder Name:William Lawrence   -  
Project:   Sonex   -   VIEW REPORTS
Total Hours:1884.3
Total Flight Time:
Start/Last Date:Nov 21, 2018 - No Finish Date
Engine:Aerovee
 
Friendly URL: https://eaabuilderslog.org?s=wlawrence

Home or Last Project Picture

Oct 29, 2023     Reassemble the panel Category: Instrument Panel
With the fuel gauge fixed, I reassembled the panel. The extension is now secure with a mix of soft aluminum rivets, easier to drill out next time, and 4-40 machine screws into the previously installed itty-bitty nut plates.
 
Oct 01, 2023     Nut plates       Category: Instrument Panel
I wasn't happy with the accuracy I was able to achieve using these tee-ninesy 4-40 nut plates as there own drill jig, so I fabricated a drill jig using idea from Tony Bingelis, using a chunk of mild steel and a section of brass tubing located in place.

Also finished fabrication of the fuel dip stick, and pulled the malfunctioning fuel sensor probe.


 
Sep 04, 2023     Windshield off, glare shield extension off       Category: Instrument Panel
With my son's help, removed the last windscreen fasteners. Later in the day, drilled the last rivets in the glare shield extension to access the back of the panel and disconnected the fuel level probe, which needs to be replaced.

Also worked on the fuel tank dip stick, clear fuel tubing with an aluminum spine. Dip, hold your thumb over the tube, pull, read the level.


 
Sep 27, 2020     Programming Dynon - (3 hours)       Category: Instrument Panel
John Koehler working on programming Dynon in instrument panel.


 
Sep 25, 2019     Test Instrument Panel In Aircraft - (3 hours)       Category: Instrument Panel


 
Sep 22, 2019     Install Control Stick grips - (5 hours)       Category: Instrument Panel


 
Sep 15, 2019     New Instrument Panel - (8 hours)       Category: Instrument Panel
New Instrument fit to fuselage.and secured.


 
Sep 14, 2019     Installing New Panel in Aircraft - (15 hours)       Category: Instrument Panel


 
Aug 27, 2019     New Instrument Panel Photos       Category: Instrument Panel
Photos of new instrument panel that Marc Ausman built for Sonex project.


 
May 30, 2019     New Instrument Panel Fabrication - (10 hours)       Category: Instrument Panel
Lee Teicheira, Frank Kelly, Marc Ausman and Bill Lawrence work on installation of new instrument panel and glare shield extension.


 
May 23, 2019     Install instrument panel glare shield extension - (8 hours)       Category: Instrument Panel
Lee Teicheira, Jon Koehler, Frank Kelly and Bill Lawrence install instrument panel glare shield extension to accommodate new panel.


 
NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.