Project: phowe   -  
            Listing for Category : firewall
    (Please mouse-over any icon to get a description of that function).


  
Builder Name:Philip Howe   -  
Project:   Rans - S-21 Outbound   -   VIEW REPORTS
Total Hours:1654.75
Total Flight Time:6
Total Expense:N/A
Start/Last Date:Oct 19, 2020 - No Finish Date
Engine:Rotax 915is
Propeller:Whirlwind
Panel:Dynon
 
Friendly URL: https://eaabuilderslog.org?s=phowe

Home or Last Project Picture

Apr 10, 2024     Final Rivets in Firewall - (4 hours) Category: Firewall
I installed the final 8 stainless steel rivets in the firewall. I riveted the firewall to the tabs on the cage. A note to self, do this before you mount all the other items on the firewall :(.
 
Apr 09, 2024     Electrical Passthrough - (1.5 hours)       Category: Firewall
We installed the electrical passthrough that I purchased from Aircraft Spruce. I didn't want to use the rubber grommet that Ran's supplied. We used stainless steel screws to attach and a sealant.


 
Sep 20, 2023     Interference of Engine and Nose Gear Mounts - (3 hours)       Category: Firewall
To eliminate the interference Ran's tech support advised moving the the engine mount forward about a 1/4". We could use either wide-area washers or spacers. We tried washers first but the welds on the top of the engine mounts didn't allow the washers to lay flat. Brenden the fabricated spacers. The diameter for the top mounts was perfect for the welds. The bottom mounts the diameter of the spacers was too narrow. In a tech support call to Rans, they agreed to ship 2 more spacers with the same part number as the original one and we will double them up. I ordered 4 new bolts to mount both mounts to the firewall that are each 1/4" longer from Aircraft Spruce.


 
Sep 11, 2023     Battery Box and Engine mount - (6 hours)       Category: Firewall
Taylor mounted the EarthX battery box on the firewall. He then worked on getting the engine mount and the nose gear mount installed on the firewall. We have some questions about the spacers at the bottom of the mounts. Rans shipped 3 spacers but plans only mention using one. One of the engine mount bars touches one of the nose gear mount bars. We have a question in to Rans tech-support.


 
Aug 29, 2023     Additional Items on the Firewall - (4 hours)       Category: Firewall
Taylor worked on the firewall again this AM. Including the parking brake which is located inside.


 
Aug 28, 2023     Start to hang components on the firewall - (8 hours)       Category: Firewall
Taylor worked on installing the FWF components on the firewall.


 
Aug 22, 2023     Inventory FWF Kit - (16 hours) Category: Firewall
Chris and Taylor inventoried the FWF kit for the 915is from Rans that I had ordered earlier in the year.
 
Dec 08, 2021     Finished Riveting of the Firewall - (1 hour)       Category: Firewall
With the ordered rivets we completed the riveting, in fact, because this batch left the mandrel in the rivet head we replaced all the other rivets that the mandrel was missing.


 
Nov 18, 2021     Temp Attached and match drilled to mounting tabs - (2 hours)       Category: Firewall
The fit was terrible we ended up using 4 bolts instead of 2 that was suggested we ended having to pound in the bottom bolts. Really concentrated on making sure it was flush against the cage before drilling.


 
Nov 18, 2021     More Coats of Truck bed liner - (1 hour)       Category: Firewall


 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.