Project: phowe   -  
            Listing for Category : landing gear
    (Please mouse-over any icon to get a description of that function).


  
Builder Name:Philip Howe   -  
Project:   Rans - S-21 Outbound   -   VIEW REPORTS
Total Hours:1654.75
Total Flight Time:6
Total Expense:N/A
Start/Last Date:Oct 19, 2020 - No Finish Date
Engine:Rotax 915is
Propeller:Whirlwind
Panel:Dynon
 
Friendly URL: https://eaabuilderslog.org?s=phowe

Home or Last Project Picture

Sep 20, 2023     Nose Gear Tire - (3 hours)       Category: Landing Gear
Chris and I refabricated the left spacer to be 1/16" longer and trimmed the right one by a 1/16th for better placement of the wheel. We primed both spacers and put lithium grease on the interiors of each then mounted the tire and installed of the remaining hardware. We torqued all of the nuts and bolts.


 
Sep 19, 2023     Nose Gear - Mount Tire and Spacers - (7 hours)       Category: Landing Gear
I mounted the tubeless tundra tire on the MATCO rim after we received the valve kit from MATCO. We discovered the axle had some rust so Chris used Scotchbrite to remove it. we will cover it in lithium grease when we install it on the final assembly. Chris and I mounted the wheel and measured and determined the length of the spacers. We then cut the spacers, deburred, and then primed them.


 
Sep 18, 2023     Main Gear Fuselage Fairings - (6 hours) Category: Landing Gear
We trimmed and started sanding the plastic parts of the fairing. We still need to trim the holes for the gear legs and probably additional trimming and sanding for fit.
 
Sep 13, 2023     Nose Gear Yoke - (2 hours)       Category: Landing Gear
We finished the assembly and mounted the nose gear tundra tire yoke.


 
Sep 12, 2023     Front Landing Gear - (5 hours)       Category: Landing Gear
Taylor drilled out the holes in the front landing gear strut. He also assembled the wheel mount. Chris and I tried to mount the tire to the rim but discovered there was no valve stem kit provided. I located and ordered one from Matco.


 
Sep 11, 2023     Attached the tundra tires - (2 hours)       Category: Landing Gear
We mounted the new tundra tires on the main gear with the repacked bearings.


 
Sep 01, 2023     Tundra Tires ready to Mount - (6 hours)       Category: Landing Gear
Son Chris and I mounted the tundra tires on the rims. We also had to clean and repack the wheel bearings as metal flakes had fallen on them.


 
Aug 31, 2023     Inserted Innertubes into the Tundra tires - (1 hour)       Category: Landing Gear
Innertubes arrived today so we inserted them into the tires.


 
Aug 30, 2023     Separated Rims from Tires - (1 hour)       Category: Landing Gear
Chris separated the main gear rims from the tires. We are waiting on the inner tubes to arrive from Rans so we can install the tundra tires


 
Aug 29, 2023     Separate the wheels - (3 hours) Category: Landing Gear
Son Chris worked on separating the rims to remove the older tires. to install the tundra tires. We are still waiting on the inner tubes from Rans.
 
Aug 25, 2023     Convert to Tundra Gear - (10 hours)       Category: Landing Gear
I decided to upgrade the landing gear to the tundra option. I ordered the parts in the first part of the year. Brother Chris and Taylor inventoried the parts this week, Removed the old main gear removed the brakes and the brake lines, and transferred them to the new main gear. They then attached the new main gear to the fuselage, which is longer.


 
Feb 14, 2022     Brake line - (4 hours)       Category: Landing Gear
Mounted fittings on the calipers and drilled holes in the fuselage. Fitting on the fuselage on the right side and attached brake line in the main gear leg. It required removing one of the rear main gear bolts from each leg.


 
Dec 06, 2021     Installed Optional Jack Lugs on the main gear - (3 hours)       Category: Landing Gear
Removed both main gear wheels, bearings, and brake discs. Installed the new bolt and jack lug on the lower rear wheel attachment. Then reassembled the wheel/gear.


 
Nov 16, 2021     Landing Gear - (12 hours)       Category: Landing Gear
Attached the main landing gear legs to the fuselage. Figured out how to attach the brake calipers to the wheels and how to attach the axles and calipers to the gear legs. Torqued the axes to the legs using the same figures appropriate to the AN bolts. On one of the main gear wheels, Split the Wheel, inserted the tube in the tire (after putting talc powder on the innertube), mounted the tire on the rim, tightened the nuts of the rim to the correct torque. Finally packed the 2 bearings.
We had to call Matco to get install instructions for these wheels and brakes.


 
Nov 15, 2021     Started work on the main landing gear - (4 hours)       Category: Landing Gear
Located all of the parts for the main landing gear. We then sanded the gear to remove the light corrosion, then primed it for installation tomorrow.


 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.