Project: phowe   -  
            Listing for Category : misc
    (Please mouse-over any icon to get a description of that function).


  
Builder Name:Philip Howe   -  
Project:   Rans - S-21 Outbound   -   VIEW REPORTS
Total Hours:1654.75
Total Flight Time:6
Total Expense:N/A
Start/Last Date:Oct 19, 2020 - No Finish Date
Engine:Rotax 915is
Propeller:Whirlwind
Panel:Dynon
 
Friendly URL: https://eaabuilderslog.org?s=phowe

Home or Last Project Picture

Apr 15, 2024     Schematics - (6 hours) Category: MISC
Chris continued to make the schematics for the rest of the wiring ie to the lights pitot tube heater.
 
Apr 12, 2024     Schematics - (6 hours)       Category: MISC
Chris continued to work on the schematics. He worked on adding all the connectors we have added including wire colors and pin numbers.


 
Apr 11, 2024     Schematics - (5 hours)       Category: MISC
Chris continues to enhance and add information to CAD files provided by Advanced. He is adding information on the wiring we are doing and adding the connectors that we are installing.


 
Sep 13, 2023     Engine Mount Nose Gear mount interference - (.5 hour)       Category: MISC
I have been emailing pictures and questions back and forth to Rans' tech support regarding the interference between the 915 engine mount and the tundra tike nose gear mount.


 
Sep 13, 2023     Searching - (2 hours) Category: MISC
Chris and I spent time searching for the plastic stabilizer end caps. Also searched for the Aerosport parts I had ordered.
 
Sep 12, 2023     Drill bits - (1 hour) Category: MISC
I ran out and bought cobalt drill bits and reams for drilling out the nose gear strut.
 
Aug 21, 2023     Find all the parts - (16 hours) Category: MISC
Brenden, Taylor, and brother Chris spent a good part of the day locating all of the parts that had been stored and delivered in the previous year. They moved them all into the hangar for the build.
 
Aug 21, 2023     RESTART BUILD AFTER YEAR DELAY Category: MISC
The reason there is such a delay between March 2022 and August 2023 is that I spent 6 months of 2022 in the hospital followed by 3 months of chemotherapy. I then slowly gained my strength back and was able to start up again following my daughter's wedding and a well-deserved family vacation.
 
Dec 14, 2021     Not a productive day!       Category: MISC
Not a very productive day Icy roads and the downside to putting on the wings.


 
Jun 28, 2021     Header Tank - (1 hour) Category: MISC
After going back and forth with Rans on which header tank to order....decided on the 2.7-gallon header tank and added the electric fuel pump as well.
 
Jun 28, 2021     Shot for balancing the ailerons and elvator - (1 hour) Category: MISC
scoured the web to find reasonably priced shot, found a site and ordered 25lbs
 
May 04, 2021     Sick as a dog Category: MISC
All I can figure out is that I had some sort of reaction to my second Vaccination....Horrible abdominal pain Monday night and Tues. leaving Brenden to focus on the optional wing lights.
 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.