Project: Phillip64   -  
            Listing for Category : Show all entries
    (Please mouse-over any icon to get a description of that function).


  
Builder Name:Phillip B. Leu   -  
Project:   Just - Highlander   -   VIEW REPORTS
Total Hours:548
Start/Last Date:Nov 06, 2020 - No Finish Date
Engine:Yamaha APEX
 
Friendly URL: https://eaabuilderslog.org?s=Phillip64

Home or Last Project Picture

Apr 20, 2024     Drain Port - (5 hours)       Category: Fuel System
Bracket for the fuel drain device fabricated and fitted.


 
Apr 03, 2024     Butt Rib - (3 hours)       Category: Fuselage
Reinforcing tape hisoled in with epoxy and attached to the But Rip with the rivets.


 
Apr 02, 2024     Fuel Lines - (6 hours)       Category: Fuel System
Fuel lines measured and fitted. Filters and pumps correctly attached and marked.


 
Mar 19, 2024     Delivery - (2 hours)       Category: Propeller
Great satisfaction! The first delivery of NR Prop has arrived. Three propeller blades, and the mounting: 160HP CARBON propeller: SR118-2000mm(3-blades, stroke 75 / 101,6)


 
Mar 09, 2024     Corner Side Windows - (4 hours)       Category: Fuselage
Side window fitted. Edges deburred, fixing holes drilled. Cut out two templates for the two Lexan windows and drilled the mounting holes for the Lexan windows.


 
Feb 24, 2024     Baggage Door - (4 hours)       Category: Fuselage
Base plate cut to size and fitted. Sides trimmed. Glued in with epoxy and firmly installed with 2 x 4 rivets.


 
Feb 15, 2024     Baggage Door - (5 hours)       Category: Fuselage
Square aluminum bars cut to size and fitted for the two side borders. The two fastening connections for the door lock were manufactured and fitted.


 
Feb 13, 2024     Baggage Door - (2 hours)       Category: Fuselage
Round aluminum tube for the rear base plate cut to size and fitted. Hisoled in with epoxy.


 
Feb 10, 2024     Wiring - (3 hours)       Category: Avionics
Various cables inserted. Cable connections labeled.


 
Jan 25, 2024     Fuel Tank leadin edge - (3 hours)       Category: Wings
Place and fit the front angle piece of the front of the tank between rib #1 and #2. Two times 11 nut plates were fitted to the fuel tank leading edge at a distance of approx. 7.5 cm and fastened with rivets. Not yet bonded with epoxy adhesiv.


 
Jan 25, 2024     Butt Rib - (1 hour) Category: Wings
Positioned and marked.
 
Jan 24, 2024     Wing Tip - (3 hours)       Category: Wings
It is possible to attach the wing tips permanently with rivets or removably with nut plates. I opted for nut plates. On the one hand, there is access to the inside of the wing and the lights and on the other hand, with a tailwheel airplane, a wing tip ground contact with possible damage to the wing tips can never be completely ruled out. According to the building instructions, the nut plates should be attached to the inside of rib #9. However, the distance to the edge of the wing tips is only approx. 5 mm. On the outside of rib #9 it would be more, but because the gluing interferes there, the nut plates would be on the outer edge of the rib! So I decided to split the nut plates. One part on the inside and one part on the outside.


 
Jan 23, 2024     Remote Magnetometer - (3 hours)       Category: Avionics
Dynon SV-MAG-236 remote magnetometer installed. Brackets made out of aluminium strips. Try the position in the middle of the rear part of the luggage compartment.


 
Jan 22, 2024     Door Frame - (1 hour)       Category: Fuselage
Alu tubes from right door frame adappted and bonded with epoxy adhesiv and rivets.


 
Jan 21, 2024     Rib Stiffener - (3 hours)       Category: Wings
Rib stiffener for right rib #1 prepared. Bonded with epoxy adhesive and fastened with 5 rivets. The reinforcement is completed at the passages for the tank connections.


 
Jan 19, 2024     Butt Rib - (2 hours)       Category: Fuselage
The two fixing lugs are (right wing) adjusted in length and prepared for installation.


 
Jan 18, 2024     Door Frame - (2 hours)       Category: Fuselage
More Steel brackets from right door frame adappted and fixed with epoxy and rivets.


 
Jan 13, 2024     Bracket for Pitot - (2 hours)       Category: Wings
Bracket for the pitot bent and holes countersunk. Attached to the rib with rivets and epoxy.


 
Jan 13, 2024     Door Frame - (3 hours)       Category: Fuselage
Steel brackets from right door frame adappted and fixed with epoxy and rivets.


 
Jan 12, 2024     Fuel Shutoff Valve - (2 hours)       Category: Fuel System
Bracket for the fuel shut off valve made of 1 mm aluminum sheet and mounted on the valve.


 
Jan 12, 2024     Fuel Filter - (1 hour)       Category: Fuel System
40 micro fuel fliter provisionally installed.


 
Jan 09, 2024     Fuel Pump - (3 hours)       Category: Fuel System
Fuel pumps fitted under the right-hand seat. Fixed with aluminum L-bars.


 
Jan 08, 2024     Fuel Filter - (3 hours)       Category: Fuel System
Fuel filter fitted under the left seat. Fixed with aluminum L-bars.


 
Jan 07, 2024     Nut Plates - (4 hours)       Category: Wings
On the right wing, fit the nut plates K1000-08 to the two ribs 1 and 2 at a distance of 3 in and fasten with flush rivets.


 
Jan 04, 2024     Door Frame - (3 hours)       Category: Fuselage
Door frame right: The upper two steel brackets fitted. Installed with epoxy and positioned with two cleco fastener.


 
Jan 03, 2024     False Rib R Wing - (2 hours)       Category: Wings
False rib fitted in the left wing and covered with epoxy.


 
Dec 14, 2023     First Run - (9 hours)       Category: Engine
Motor reinstalled on the mount. All cables, lines and connections installed. Motor put back into operation. Successful idle settings. Regulator installed.


 
Dec 08, 2023     Door Frame - (3 hours)       Category: Fuselage
Left-hand door upper hinge and both side lower hinge bent, fitted, hysoled with epoxy and riveted. I deliberately cast all the angle brackets with epoxy resin. This makes the whole bracket more stable and less sensitive to vibrations.


 
Dec 06, 2023     Door Frame - (3 hours)       Category: Fuselage
Upper hinge for the right-hand door bent, fitted, hysoled with epoxy and riveted.


 
Dec 05, 2023     Door Frame - (3 hours)       Category: Fuselage
Lower hinge for the left-hand door cut out, bent and fitted.


 
Dec 03, 2023     Pitot - (4 hours)       Category: Wings
Pitot AOA bracket from Dynon fitted.


 
Nov 29, 2023     Wing Trailing Edge - (4 hours)       Category: Wings
Wing trailing edge fitted. Slots for flap and aileron brackets drawn in and cut out. Brackets inserted and transitions filed flat.


 
Nov 26, 2023     Wing Trailing Edge - (5 hours)       Category: Wings
Wing trailing edge fitted. Slots for flap and aileron brackets drawn in and cut out. Brackets inserted and transitions filed flat.


 
Nov 24, 2023     Architecture - (2 hours)       Category: Fuel System
Starting and classification of fuel pumps and filters. I would like a 100 micro coarse filter before each pump and a 40 micro fine filter after the pump.


 
Nov 24, 2023     False Ribs - (2 hours)       Category: Wings
Two false ribs (14 in total) positioned between two ribs. Marked, cleaned and hisoled with epoxy.


 
Nov 22, 2023     Wing Trailing Edge - (4 hours)       Category: Wings
Wing trailing edge mounted, cut to the correct length. Drill 1/8 " holes for the attachment. Mark the slots for the flap and aileron brackets. Drill end holes for these slots.


 
Nov 21, 2023     Cable guides - (4 hours)       Category: Wings
2 x 16 cable guides cut to 5 cm (2 in). Drill holes in the end parts of ribs 1, 2, 4, 5, 7 and 9 as well as end piece 1b according to template 1 - 7. Insert the cable guides and heal with epoxy.


 
Nov 20, 2023     Stringer tube - (2 hours)       Category: Wings
Fitted, cut to length, sanded and then coated with epoxy.


 
Nov 16, 2023     # 1 Rib       Category: Wings
Made holes for fuellines.


 
Nov 16, 2023     # 1 Rib - (3 hours) Category: Wings
 
Nov 08, 2023     Fuel Tank - (4 hours)       Category: Fuel System
Right Wing. 4 angle aluminum pieces prepared. Hisoled and riveted to the spar tube. To mark the the location on the spar tubes and on the angle where they touch, I used tape. Drawed this lines on both ends of the angle pieces. I used adhesive tape to make the correct markings. This is much easier than marking directly on the spar tubes with a marker.


 
Nov 03, 2023     D-Check - (6 hours)       Category: Engine
D-Check, Heavy Maintenance on my Yamaha APEX: Everything taken apart. Various gaskets houses and o-ring ordered from MegaZip. Delivery date: Approx beginning of December, then everything will be screwed back together.


 
Oct 29, 2023     Fuel Tank - (5 hours)       Category: Fuel System
The right wing assembled and supported. Clamped two straight wooden strips under the two ribs #1 and #2. Fuel tank placed inside and centered. Attach a 4mm thick self-adhesive rubber tape to the short side of the aluminum wing. This way the tank "floats" on the aluminum fasteners. Clamped the aluminum angles with clegos to the bottom of the flanges of the tank.


 
Oct 27, 2023     AEM EFI System - (2 hours)       Category: Engine
With the active support of HelfTec Engineering in Hildisrieden, the control system from BD-Turnkey was set up, connected and put into operation. The results are super and as expected. In the next few days it will be married with my Yamaha APEX.


 
Oct 26, 2023     Transport - (3 hours)       Category: Engine
My Yamaha APEX is lashed to the trailer and ready to go. In the next few days the controller will be attached and then it should be ready for the first engine start!


 
Sep 15, 2023     Aileron & Flaps - (5 hours)       Category: Wings
Abraded the inside face at each rib position. Applyed generous coating of epoxy adhesive to each rib tail. Trailing edge re-fit and secure in position.
Measurements are still correct, countersink rivets 3/32 x 1/8 flush aluminum used.


 
Sep 12, 2023     Aileron & Flaps - (2 hours)       Category: Wings
Bronze bushings (W-0470) lightly pressed into place.


 
Sep 11, 2023     Aileron & Flaps - (6 hours)       Category: Wings
Leading edges cut, sanded and fitted. Do it outside and with a mask! Evil dust!!


 
Sep 07, 2023     Door - (2 hours)       Category: Fuselage
Left door top hinge installed.


 
Sep 05, 2023     Windshield Front Angle Brackets - (5 hours)       Category: Fuselage
Two front angle brackets F-2650 attached to the fuselage. Holes in the tabs opend to 1/8” to take AD44ABSLF 1/8 x 1⁄4 large head aluminum rivets.
Front brackets trimmed to fit the windshield post between the head rack and the angle of the door frame.


 
Aug 16, 2023     Door - (4 hours)       Category: Fuselage
Right door top hinge installed.


 
Aug 16, 2023     Side Stringer - (2 hours)       Category: Wings
Right Side Stringer fixed in place with structural adhesive.


 
Aug 15, 2023     Aleron & Flaps - (5 hours)       Category: Wings
Fitted the trailing edge into the rear face of the spar tube. Distance 8 1⁄2”. Abrade the inside face at each rib. Drilled No 40 (3/32") hole, 1⁄4” back from the trailing edge leading edge and midway between the rib center line and right hand outer edge of the cap strip. Countersinked all holes in trailing edge material.


 
Jul 21, 2023     Wing Joint Doublers - (3 hours)       Category: Wings
Ream out the large hole to 5/16” and the small rivet holes to No.30 then deburr all holes. Scuffed the powder coating from the convex side of the doubler and abrade the inside of the spar tube. Coated epoxy to both mating faces then use bolt and Clecos to hold doublers in place. Secured with CCP44 rivets. Clean up excess adhesive with acetone.


 
Jul 20, 2023     Ribs - (2 hours)       Category: Wings
Cuted away the top and bottom rib cap strips in line with the rear face of the rib web.
Radius the cut edges so that they will conform to the inside radius of the metal trailing edge.


 
Jul 19, 2023     Seat Belts - (3 hours)       Category: Interior Finish
First two 7 ft. piece of 1/8" cable for seat belt attached. Cut nylon tubing 6". Cable crimped. Put each cable around the tubing at the rear of the seat slides on each side of the seat.


 
Jul 16, 2023     Flaps & Slats - (4 hours)       Category: Wings
Sand all four flaps and slats with sandpaper.


 
Jul 05, 2023     Flying Wire - (3 hours)       Category: Fuselage
I did not make the two lower flight wires one continuous piece. I made a steel Y-piece so I could attach two independent flight wires. I temporarily attached the two Y pieces, they still need to be powder coated.


 
Jun 30, 2023     Jury strut - (6 hours)       Category: Wings
Jury strut adjusted, looped with hysol with epoxy adhesive and rivets tightened


 
Jun 25, 2023     Elevator - (3 hours)       Category: Controls
Elevator connected and coupled to the control rod.


 
Jun 24, 2023     Horizontal Stabilizer - (5 hours)       Category: Fuselage
Horizontal stabilizer fitted, fastened and bolts coated with locking varnish.


 
Jun 11, 2023     Fuselage on Rotary again - (3 hours)       Category: Fuselage
Disassembled landing gear and reinstalled the fuselage on the rotary. Elevator and rudder aligned, checked with laser and fixed with clamping set.


 
Jun 05, 2023     Sport Aviation - (1 hour)       Category: Paperwork
With great pleasure I found out that I made it into the Sport Aviation of the EAA.


 
May 25, 2023     Cockpit Mockup - (7 hours)       Category: Instrument Panel
Cockpit panel further machined. More instruments fitted and installed. The switches are still missing.


 
May 01, 2023     Fwd Kick Panel Window - (3 hours)       Category: Fuselage
Marked the three holes and cut them out with the scroll saw.


 
Apr 28, 2023     Side Stringer - (5 hours)       Category: Fuselage
Both side stringers are fitted and holes drilled for the spigots. Shorten the spigots so that both side stringers fit regularly and give the fuselage a good shape. Fit both tube ends so that it fits into the spigot of the fuselage.


 
Apr 25, 2023     AP Servo-Bracket - (2 hours)       Category: Controls
Made a bracket from cardboard for the AP roll-servo.


 
Apr 13, 2023     Firewall, Motor Mount - (7 hours)       Category: Firewall
Firewall cut, fitted and drilled. Engine mount installed and holes drilled.


 
Apr 04, 2023     Cockpit Mockup - (5 hours)       Category: Instrument Panel
Cockpit panel made of wood and the first few instruments installed and adjusted.


 
Mar 17, 2023     1. Installation - (3 hours)       Category: Wings
The first time both wings installed and the rear lower connection hole drilled out. Wing end edge to fuselage end measured: Difference is 1 cm.


 
Mar 14, 2023     Wing Joint Doublers - (2 hours)       Category: Wings
The 8 Wing Root Doublers, W-0210.0 fitted. Drilled #30 and deburred. All numbered and prepared to epoxy.


 
Mar 14, 2023     Jury Struts - (2.5 hours)       Category: Wings
Jury strut spar attach brackets W-0700.0 two mounting holes drilled with #30 Drill and reamed. Installed 53" root end. Brackets, deburred. Powder coat scuffed from mating surface of the bracket, and thoroughly cleaned. Prepared for epoxy.


 
Mar 10, 2023     Autopilot Servo-Bracket - (2.5 hours)       Category: Controls
Made a bracket from cardboard for the AP servo for attitude.


 
Mar 08, 2023     Fwd Kick Panel Window - (4 hours)       Category: Fuselage
Since I did not make the floor panels from the planned aluminum panels, I was able to use the two panels for the forward kick panel windows. The thickness of 0.020" (0.5 mm) fit.


 
Mar 03, 2023     Lift Strut Brackets - (4 hours)       Category: Wings
Left Wing Lift strut brackets and spar tube roughen surfaces, clean with acetone, rub with sufficient epoxy adhesive, tighten with hose clamp, set rivets.


 
Mar 01, 2023     Lift Strut Brackets - (2 hours)       Category: Wings
Right Wing Lift strut brackets adjusted and fixed to the spar with two hose clams. Holes drilled and reamed. Fastening the lift strut bracket with Clecos.


 
Feb 27, 2023     Lift Strut Brackets - (3 hours)       Category: Wings
Left Wing Lift strut brackets and spar tube roughen surfaces, clean with acetone, rub with sufficient epoxy adhesive, tighten with hose clamp, set rivets.


 
Feb 26, 2023     Lift Strut Brackets - (4 hours)       Category: Wings
Left Wing Lift strut brackets adjusted and fixed to the spar with two hose clams. Holes drilled and reamed. Fastening the lift strut bracket with Clecos.


 
Feb 20, 2023     Autopilot Servo-Bracket - (3 hours)       Category: Controls
Bracket for Dynon AP-Pitch-Servo cut out and adapted


 
Feb 20, 2023     Autopilot - (3 hours)       Category: Controls
Tray for Autopilot Servo, cut out and inserted.


 
Feb 19, 2023     Gussets - (2 hours)       Category: Wings
Last 2 x 4 gussets applied with adhesive, secure in place and applied a further fillet of adhesive along the drag tube and spar joints.


 
Feb 18, 2023     Wing tip braces and gussets - (5 hours)       Category: Wings
Fitted, cleaned, bonded and riveted 2 W-0100 tip brace tubes between the rear spar and the No 9 rib. Made a bigger part of flatten end at the ribe side on the longer brace. Firs 2 x 4 gussets applied with adhesive, secure in place and applied a further fillet of adhesive along the drag tube and spar joints.


 
Feb 13, 2023     Top Stringer - (3 hours)       Category: Fuselage
Top stringer attached and two holes are drilled for the vertigal spigots. Fit the bent end of the tube so that it fits into the front tube of the vertical stabilizer. Fit the airfoil to the vertical stabilizer.


 
Feb 12, 2023     Flying Wire - (3 hours)       Category: Empennage
Alternative attachment for the flying wire constructed on the underside of the horizontal stabilizer. 2.5 mm metal plate fabricated and fitted. This allows two flying wires to be attached independently.


 
Feb 06, 2023     Brake System - (5 hours)       Category: Gear & Brake
Brake cables connections tightened with a torque of 16 Nm and marked with securing lacquer.


 
 
Feb 02, 2023     Rudder cable - (3 hours)       Category: Controls
Rudder Cables installed


 
Feb 01, 2023     Tail Wheel - (6 hours)       Category: Gear & Brake
Matco Tail Wheel installed.


 
Jan 29, 2023     Rudder - (2 hours)       Category: Controls
Nylon tubing installed, Rudder temporarily installed, Rudder Stop timmed to +/- 30°


 
Jan 28, 2023     Brake Padles - (5 hours)       Category: Gear & Brake
Powder coated brakes picked up, adjusted and installed.


 
Jan 15, 2023     Master Cylinder - (3 hours)       Category: Gear & Brake
Master brake cylinder mounted and connected to the parking brake.


 
Jan 14, 2023     Park Brake - (3 hours)       Category: Gear & Brake
Parking brake adapted, equipped with wooden handle, painted with green rubber paint and mounted with the brake valve.


 
Jan 10, 2023     Brake pedals - (2 hours)       Category: Gear & Brake
Brake pedals and all other parts prepared for powder coating and brought over.


 
Jan 06, 2023     Wheels and Brakes - (3 hours)       Category: Gear & Brake
Beringer Wheel and Brake kit for Just Aircraft Highlander installed (first provisional). Axle cleaned with sandpaper and alcohol and then finely greased. Provisionally installed for now, I still have to organize the eight mounting screws.


 
Jan 03, 2023     Main LDG Gear - (6.5 hours)       Category: Gear & Brake
Landing Gear legs, V-brace, bungee struts reamed, deburred and prepared. All mutually adjusted and tuned. Assembled and provisionally mounted.


 
Dec 21, 2022     Rudder pedal prepared for powder coating - (2.5 hours)       Category: Controls
Rudder pedal prepared for powder coating. Position fixed with rivets. I put the holes on the back side of the tube. So it is still possible to use the holes on the top for lubrication.


 
Dec 19, 2022     Sanding - (4.5 hours)       Category: Wings
Wing ribs and Plywood gussets for drag tubes drilled and sanded


 
Nov 12, 2022     Trim Tab - (2.5 hours)       Category: Empennage
Trim tab positioned, hinge installed and trimmed. Trim bracket cut and riveted in place.


 
Nov 12, 2022     Horizontal Stabilizer - (2 hours)       Category: Empennage
Adjust front mounting bracket and bushing tubes and set up to 0 deg. Both parts of the horizontal stabilizer attached and fitted.


 
Nov 06, 2022     Manual Trim - (3.5 hours)       Category: Controls
Manualle trim fitted, plate and trim lever equipped with own design


 
Nov 05, 2022     Flaphandle - (2.5 hours)       Category: Controls
Flap plates, handle and pulleys fitted and installed.


 
Nov 01, 2022     Verical stabilizer - (1.5 hours)       Category: Empennage
Vertical stabilizer, fin fitted and fastened


 
Nov 01, 2022     Elevator control - (2.5 hours)       Category: Controls
Push pull crank and both push pull tube installed


 
Oct 25, 2022     Choice of instruments - (1 hour)       Category: Instrument Panel
One of many ideas how the instrument panel could look like.


 
Oct 24, 2022     Control stick and mixer - (2.5 hours)       Category: Controls
Control mixer installed. Nylon bushings reamed and installed. Control sticks inserted. First seat try out!


 
Oct 23, 2022     Beringer brakes - (4.5 hours)       Category: Gear & Brake
Rudder pedal installed. All holes reamed, Bearinger brake cylinder installed. Rudder pedal unit F-0800 not yet painted.


 
Oct 01, 2022     Floor panels - (3.5 hours)       Category: Interior Finish
Holes for rivet nuts drilled (5 mm) deburred and riveted with M 3 galvanized steel rivet nuts. Bottom boards fastened with M 3 flattened half-round head screws.


 
Sep 30, 2022     Floor panels - (1.5 hours)       Category: Interior Finish
Fitted and drilled panels. Decided to use 3 mm and 5 mm aircraft plywood. I fasten them with M 3 rivet nuts so that I can remove the panels again if necessary.


 
Sep 28, 2022     Floor panels - (2 hours)       Category: Interior Finish
Decided to make my floor panels out of aircraft plywood.


 
Sep 22, 2022     Flooring side pieces - (2.5 hours)       Category: Interior Finish
Flooring side pieces made out of 3mm aircraft plywood and covered with Oratex (Super Cup yellow). Inserted with M3 screws into rivet nuts.


 
Sep 17, 2022     Seat adjuster - (3.5 hours)       Category: Interior Finish
Seat adjustment pin with spring installed, holes for the adjustment drilled. Stop ring installed.


 
Jun 18, 2022     Seats installed - (4 hours)       Category: Interior Finish
Seat runners installed, seat adjuster rail installed, seat fitted into the fuselage.


 
Jun 13, 2022     Seat - (4 hours) Category: Interior Finish
Seats completed. Sheet metal for seat adapted, holes drilled, edges broken.
 
May 16, 2022     Rotable Fuselage - (4 hours)       Category: Workshop
Finishing and installing the tail part of the rotating suport frame for my fuselage.


 
Apr 25, 2022     Seat Base - (4 hours)       Category: Interior Finish
Process the sheet metal of the seat backrest: Drill holes for mounting (#30) and drill 9 holes (2") and deburr.


 
Apr 23, 2022     Rotable Fuselage - (3 hours)       Category: Workshop
Drilling, cutting and screwing on the supports for the rotating support frame.


 
Mar 19, 2022     Pick up Kit in Hamburg - (26 hours)       Category: Workshop
Sursee - Hamburg - Sursee, about 1'900 km; loading, securing; customs clearance


 
Oct 04, 2021     Before - (1 hour)       Category: Workshop
Indoor swimming pool. Currently still in operation, about to be transformed into the workroom.


 
Dec 16, 2020     Fuel pump / watercooling - (2.5 hours)       Category: Engine
Installing the fuel pump, fuel lines and the pips for the cooling.


 
Dec 14, 2020     Admin - (1 hour) Category: Engine
Putting list about items to sell together
 
Dec 11, 2020     Control panel - (2 hours)       Category: Engine
Installing the control panel


 
Dec 10, 2020     Watercooler - (3 hours)       Category: Engine
Preparing and installing the watercooler


 
Dec 09, 2020     Fueltank - (3 hours)       Category: Engine
Start installing the fuel tank (Yamaha XT1200)


 
Dec 09, 2020     Muffler - (3 hours)       Category: Engine
Installing the muffler to the engine mount and welding it.


 
Dec 01, 2020     Engine stand - (3 hours)       Category: Engine
Little marriage


 
Nov 30, 2020     Engine stand - (3.5 hours)       Category: Engine
Installing a engine stand. Mount on the 4 leg basis.


 
Nov 18, 2020     Evaluation - (1.5 hours) Category: Paperwork
Tel. with Tom Huber, putting vers. 1 of offer together
 
Nov 06, 2020     Ready to start - (1 hour)       Category: Engine
Some preparation to start with my Yamaha APEX


 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.