EAA Builders Log Website
EMail address:
Password:
- Lost my password
close
EAA Builders Log
(An EAA website).
Help
Contact Us
About
Sign Up
Login
Project:
Phillip64
-
Listing for Category : gear & brake
(Please mouse-over any icon to get a description of that function).
Categories
Show All Entries
- (159)
Paperwork
- (3)
Workshop
- (7)
Inspection
Empennage
- (6)
Fuselage
- (34)
Paint / Decals
Firewall
- (1)
Wings
- (36)
Controls
- (16)
Interior Finish
- (9)
Instrument Panel
- (3)
Avionics
- (2)
Lighting
Gear & Brake
- (10)
Propeller
- (1)
Engine
- (17)
Fuel System
- (14)
Builder Name:
Phillip B. Leu
-
Project:
Just - Highlander
-
VIEW REPORTS
Total Hours:
548
Start/Last Date:
Nov 06, 2020 - No Finish Date
Engine:
Yamaha APEX
Friendly URL:
https://eaabuilderslog.org?s=Phillip64
Home or Last Project Picture
Feb 06, 2023
Brake System
- (5 hours)
Category: Gear & Brake
Brake cables connections tightened with a torque of 16 Nm and marked with securing lacquer.
13744D4C-2781-49B1-9122-9E762F5D113C_1_105_c.jpeg
Feb 01, 2023
Tail Wheel
- (6 hours)
Category: Gear & Brake
Matco Tail Wheel installed.
51EF68AA-BF9D-420A-85A0-3762EE823D3F_1_105_c.jpeg
A812C077-E596-4C03-9A48-61DABCE28F9A_1_105_c.jpeg
Jan 28, 2023
Brake Padles
- (5 hours)
Category: Gear & Brake
Powder coated brakes picked up, adjusted and installed.
1B8AB187-55B2-47F9-9494-60A5874D87F7_1_105_c.jpeg
3502AFD6-2430-4C44-9CF4-7313F398D505_1_105_c.jpeg
FBBD2277-A257-41FD-BEC9-A839484C4FCD_1_105_c.jpeg
Jan 16, 2023
Brake Cable
- (4 hours)
Category: Gear & Brake
B53DD6AB-C96C-4B69-B1FC-33C7B46F3892_1_105_c.jpeg
7B64FE31-DBB4-40DE-A6D2-99E01B700EF2_1_105_c.jpeg
E2C9E042-1E5D-4BCD-9BBD-2827DC4A6839_1_105_c.jpeg
Jan 15, 2023
Master Cylinder
- (3 hours)
Category: Gear & Brake
Master brake cylinder mounted and connected to the parking brake.
169BE6AE-CA0A-4FAD-B02E-4C2AE0841305_1_105_c.jpeg
CB255A5F-A684-482F-BAD8-DC8BB3F9AAA0_1_105_c.jpeg
1BBFF5F1-D89C-40CA-A799-16C2A5B90F2D_1_105_c.jpeg
Jan 14, 2023
Park Brake
- (3 hours)
Category: Gear & Brake
Parking brake adapted, equipped with wooden handle, painted with green rubber paint and mounted with the brake valve.
2BAD9EEF-CF9E-49AC-953E-437292A4BDBB_1_105_c.jpeg
422C8556-B1DA-44E1-B66E-C475EC526531_1_105_c.jpeg
EAF1CB87-6988-4B5A-8760-6069B6192725_1_105_c.jpeg
0A541968-0C7B-4F69-9EFE-8E05FE165165_1_105_c.jpeg
Jan 10, 2023
Brake pedals
- (2 hours)
Category: Gear & Brake
Brake pedals and all other parts prepared for powder coating and brought over.
D0071690-A2FF-4922-AF0D-BD7FAB95A493_1_105_c.jpeg
F0F50B03-AA09-4495-BAFE-6CB6FE66F637_1_105_c.jpeg
Jan 06, 2023
Wheels and Brakes
- (3 hours)
Category: Gear & Brake
Beringer Wheel and Brake kit for Just Aircraft Highlander installed (first provisional). Axle cleaned with sandpaper and alcohol and then finely greased. Provisionally installed for now, I still have to organize the eight mounting screws.
4BA28016-B40E-44DB-A322-03165125244C.jpeg
63DC8478-55FD-43E5-AF4E-A725EDF6421E.jpeg
F8B91E1F-825B-4CC8-B1C8-E8AAD70019D0.jpeg
Jan 03, 2023
Main LDG Gear
- (6.5 hours)
Category: Gear & Brake
Landing Gear legs, V-brace, bungee struts reamed, deburred and prepared. All mutually adjusted and tuned. Assembled and provisionally mounted.
058B4FF5-D79A-4DA0-8F95-FB5228675FBA.jpeg
449004B2-3D92-45BD-AB9D-04C6964B6D5B.jpeg
CAAC0C2B-8DB0-41C6-9FEC-61587BC993E7.jpeg
Oct 23, 2022
Beringer brakes
- (4.5 hours)
Category: Gear & Brake
Rudder pedal installed. All holes reamed, Bearinger brake cylinder installed. Rudder pedal unit F-0800 not yet painted.
07D03CE6-257D-42F2-9E7B-87E625020291_1_105_c.jpeg
59CE5058-83C5-4855-A1E1-524071A4730B_1_105_c.jpeg
NOTE: This information is strictly used for the EAA Builders Log project within the
EAA organization
.
-
Policy
-
© Copyright 2024 Brevard Web Pro, Inc.