Project: Phillip64   -  
            Listing for Category : controls
    (Please mouse-over any icon to get a description of that function).


  
Builder Name:Phillip B. Leu   -  
Project:   Just - Highlander   -   VIEW REPORTS
Total Hours:548
Start/Last Date:Nov 06, 2020 - No Finish Date
Engine:Yamaha APEX
 
Friendly URL: https://eaabuilderslog.org?s=Phillip64

Home or Last Project Picture

Jun 25, 2023     Elevator - (3 hours)       Category: Controls
Elevator connected and coupled to the control rod.


 
Apr 25, 2023     AP Servo-Bracket - (2 hours)       Category: Controls
Made a bracket from cardboard for the AP roll-servo.


 
Mar 10, 2023     Autopilot Servo-Bracket - (2.5 hours)       Category: Controls
Made a bracket from cardboard for the AP servo for attitude.


 
Feb 20, 2023     Autopilot Servo-Bracket - (3 hours)       Category: Controls
Bracket for Dynon AP-Pitch-Servo cut out and adapted


 
Feb 20, 2023     Autopilot - (3 hours)       Category: Controls
Tray for Autopilot Servo, cut out and inserted.


 
Feb 02, 2023     Rudder cable - (3 hours)       Category: Controls
Rudder Cables installed


 
Jan 29, 2023     Rudder - (2 hours)       Category: Controls
Nylon tubing installed, Rudder temporarily installed, Rudder Stop timmed to +/- 30°


 
Dec 21, 2022     Rudder pedal prepared for powder coating - (2.5 hours)       Category: Controls
Rudder pedal prepared for powder coating. Position fixed with rivets. I put the holes on the back side of the tube. So it is still possible to use the holes on the top for lubrication.


 
Nov 06, 2022     Manual Trim - (3.5 hours)       Category: Controls
Manualle trim fitted, plate and trim lever equipped with own design


 
Nov 05, 2022     Flaphandle - (2.5 hours)       Category: Controls
Flap plates, handle and pulleys fitted and installed.


 
Nov 01, 2022     Elevator control - (2.5 hours)       Category: Controls
Push pull crank and both push pull tube installed


 
Oct 24, 2022     Control stick and mixer - (2.5 hours)       Category: Controls
Control mixer installed. Nylon bushings reamed and installed. Control sticks inserted. First seat try out!


 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.