Project: Phillip64   -  
            Listing for Category : engine
    (Please mouse-over any icon to get a description of that function).


  
Builder Name:Phillip B. Leu   -  
Project:   Just - Highlander   -   VIEW REPORTS
Total Hours:548
Start/Last Date:Nov 06, 2020 - No Finish Date
Engine:Yamaha APEX
 
Friendly URL: https://eaabuilderslog.org?s=Phillip64

Home or Last Project Picture

Dec 14, 2023     First Run - (9 hours)       Category: Engine
Motor reinstalled on the mount. All cables, lines and connections installed. Motor put back into operation. Successful idle settings. Regulator installed.


 
Nov 03, 2023     D-Check - (6 hours)       Category: Engine
D-Check, Heavy Maintenance on my Yamaha APEX: Everything taken apart. Various gaskets houses and o-ring ordered from MegaZip. Delivery date: Approx beginning of December, then everything will be screwed back together.


 
Oct 27, 2023     AEM EFI System - (2 hours)       Category: Engine
With the active support of HelfTec Engineering in Hildisrieden, the control system from BD-Turnkey was set up, connected and put into operation. The results are super and as expected. In the next few days it will be married with my Yamaha APEX.


 
Oct 26, 2023     Transport - (3 hours)       Category: Engine
My Yamaha APEX is lashed to the trailer and ready to go. In the next few days the controller will be attached and then it should be ready for the first engine start!


 
Dec 16, 2020     Fuel pump / watercooling - (2.5 hours)       Category: Engine
Installing the fuel pump, fuel lines and the pips for the cooling.


 
Dec 14, 2020     Admin - (1 hour) Category: Engine
Putting list about items to sell together
 
Dec 11, 2020     Control panel - (2 hours)       Category: Engine
Installing the control panel


 
Dec 10, 2020     Watercooler - (3 hours)       Category: Engine
Preparing and installing the watercooler


 
Dec 09, 2020     Fueltank - (3 hours)       Category: Engine
Start installing the fuel tank (Yamaha XT1200)


 
Dec 09, 2020     Muffler - (3 hours)       Category: Engine
Installing the muffler to the engine mount and welding it.


 
Dec 01, 2020     Engine stand - (3 hours)       Category: Engine
Little marriage


 
Nov 30, 2020     Engine stand - (3.5 hours)       Category: Engine
Installing a engine stand. Mount on the 4 leg basis.


 
Nov 06, 2020     Ready to start - (1 hour)       Category: Engine
Some preparation to start with my Yamaha APEX


 