Project: Phillip64   -  
            Listing for Category : fuselage
    (Please mouse-over any icon to get a description of that function).


  
Builder Name:Phillip B. Leu   -  
Project:   Just - Highlander   -   VIEW REPORTS
Total Hours:548
Start/Last Date:Nov 06, 2020 - No Finish Date
Engine:Yamaha APEX
 
Friendly URL: https://eaabuilderslog.org?s=Phillip64

Home or Last Project Picture

Apr 03, 2024     Butt Rib - (3 hours)       Category: Fuselage
Reinforcing tape hisoled in with epoxy and attached to the But Rip with the rivets.


 
Mar 09, 2024     Corner Side Windows - (4 hours)       Category: Fuselage
Side window fitted. Edges deburred, fixing holes drilled. Cut out two templates for the two Lexan windows and drilled the mounting holes for the Lexan windows.


 
Feb 24, 2024     Baggage Door - (4 hours)       Category: Fuselage
Base plate cut to size and fitted. Sides trimmed. Glued in with epoxy and firmly installed with 2 x 4 rivets.


 
Feb 15, 2024     Baggage Door - (5 hours)       Category: Fuselage
Square aluminum bars cut to size and fitted for the two side borders. The two fastening connections for the door lock were manufactured and fitted.


 
Feb 13, 2024     Baggage Door - (2 hours)       Category: Fuselage
Round aluminum tube for the rear base plate cut to size and fitted. Hisoled in with epoxy.


 
Jan 22, 2024     Door Frame - (1 hour)       Category: Fuselage
Alu tubes from right door frame adappted and bonded with epoxy adhesiv and rivets.


 
Jan 19, 2024     Butt Rib - (2 hours)       Category: Fuselage
The two fixing lugs are (right wing) adjusted in length and prepared for installation.


 
Jan 18, 2024     Door Frame - (2 hours)       Category: Fuselage
More Steel brackets from right door frame adappted and fixed with epoxy and rivets.


 
Jan 13, 2024     Door Frame - (3 hours)       Category: Fuselage
Steel brackets from right door frame adappted and fixed with epoxy and rivets.


 
Jan 04, 2024     Door Frame - (3 hours)       Category: Fuselage
Door frame right: The upper two steel brackets fitted. Installed with epoxy and positioned with two cleco fastener.


 
Dec 08, 2023     Door Frame - (3 hours)       Category: Fuselage
Left-hand door upper hinge and both side lower hinge bent, fitted, hysoled with epoxy and riveted. I deliberately cast all the angle brackets with epoxy resin. This makes the whole bracket more stable and less sensitive to vibrations.


 
Dec 06, 2023     Door Frame - (3 hours)       Category: Fuselage
Upper hinge for the right-hand door bent, fitted, hysoled with epoxy and riveted.


 
Dec 05, 2023     Door Frame - (3 hours)       Category: Fuselage
Lower hinge for the left-hand door cut out, bent and fitted.


 
Sep 07, 2023     Door - (2 hours)       Category: Fuselage
Left door top hinge installed.


 
Sep 05, 2023     Windshield Front Angle Brackets - (5 hours)       Category: Fuselage
Two front angle brackets F-2650 attached to the fuselage. Holes in the tabs opend to 1/8” to take AD44ABSLF 1/8 x 1⁄4 large head aluminum rivets.
Front brackets trimmed to fit the windshield post between the head rack and the angle of the door frame.


 
Aug 16, 2023     Door - (4 hours)       Category: Fuselage
Right door top hinge installed.


 
Jul 05, 2023     Flying Wire - (3 hours)       Category: Fuselage
I did not make the two lower flight wires one continuous piece. I made a steel Y-piece so I could attach two independent flight wires. I temporarily attached the two Y pieces, they still need to be powder coated.


 
Jun 24, 2023     Horizontal Stabilizer - (5 hours)       Category: Fuselage
Horizontal stabilizer fitted, fastened and bolts coated with locking varnish.


 
Jun 11, 2023     Fuselage on Rotary again - (3 hours)       Category: Fuselage
Disassembled landing gear and reinstalled the fuselage on the rotary. Elevator and rudder aligned, checked with laser and fixed with clamping set.


 
May 01, 2023     Fwd Kick Panel Window - (3 hours)       Category: Fuselage
Marked the three holes and cut them out with the scroll saw.


 
Apr 28, 2023     Side Stringer - (5 hours)       Category: Fuselage
Both side stringers are fitted and holes drilled for the spigots. Shorten the spigots so that both side stringers fit regularly and give the fuselage a good shape. Fit both tube ends so that it fits into the spigot of the fuselage.


 
Mar 08, 2023     Fwd Kick Panel Window - (4 hours)       Category: Fuselage
Since I did not make the floor panels from the planned aluminum panels, I was able to use the two panels for the forward kick panel windows. The thickness of 0.020" (0.5 mm) fit.


 
Feb 13, 2023     Top Stringer - (3 hours)       Category: Fuselage
Top stringer attached and two holes are drilled for the vertigal spigots. Fit the bent end of the tube so that it fits into the front tube of the vertical stabilizer. Fit the airfoil to the vertical stabilizer.


 