EAA Builders Log Website
EMail address:
Password:
- Lost my password
close
EAA Builders Log
(An EAA website).
Help
Contact Us
About
Sign Up
Login
Project:
Phillip64
-
Listing for Category : interior finish
(Please mouse-over any icon to get a description of that function).
Categories
Show All Entries
- (159)
Paperwork
- (3)
Workshop
- (7)
Inspection
Empennage
- (6)
Fuselage
- (34)
Paint / Decals
Firewall
- (1)
Wings
- (36)
Controls
- (16)
Interior Finish
- (9)
Instrument Panel
- (3)
Avionics
- (2)
Lighting
Gear & Brake
- (10)
Propeller
- (1)
Engine
- (17)
Fuel System
- (14)
Builder Name:
Phillip B. Leu
-
Project:
Just - Highlander
-
VIEW REPORTS
Total Hours:
548
Start/Last Date:
Nov 06, 2020 - No Finish Date
Engine:
Yamaha APEX
Friendly URL:
https://eaabuilderslog.org?s=Phillip64
Home or Last Project Picture
Jul 19, 2023
Seat Belts
- (3 hours)
Category: Interior Finish
First two 7 ft. piece of 1/8" cable for seat belt attached. Cut nylon tubing 6". Cable crimped. Put each cable around the tubing at the rear of the seat slides on each side of the seat.
08452F4B-7A85-45A1-9341-DFED2EBC4E05_1_105_c.jpeg
56DCCA32-F280-45BC-92F9-D9879D287CDF_1_105_c.jpeg
D0E8C0ED-2304-401D-BB3A-6779DA3E4F8C_1_105_c.jpeg
Oct 01, 2022
Floor panels
- (3.5 hours)
Category: Interior Finish
Holes for rivet nuts drilled (5 mm) deburred and riveted with M 3 galvanized steel rivet nuts. Bottom boards fastened with M 3 flattened half-round head screws.
49C9F0BF-1068-4B38-933B-FE560579F2B1_1_105_c.jpeg
ABE803AE-3E32-46B8-8B01-8481CD46CA18_1_105_c.jpeg
BD224CD1-B138-4B8F-BB9C-EC7423AF1F00_1_105_c.jpeg
Sep 30, 2022
Floor panels
- (1.5 hours)
Category: Interior Finish
Fitted and drilled panels. Decided to use 3 mm and 5 mm aircraft plywood. I fasten them with M 3 rivet nuts so that I can remove the panels again if necessary.
7DA039B3-CF02-4E4F-B7C2-8C21343A4B34_1_105_c.jpeg
F36FEFB8-5300-4B77-A8B0-D57F3DC798EE_1_105_c.jpeg
Sep 28, 2022
Floor panels
- (2 hours)
Category: Interior Finish
Decided to make my floor panels out of aircraft plywood.
D3884431-977E-4BE0-846E-F54E79357A1A_1_105_c.jpeg
Sep 22, 2022
Flooring side pieces
- (2.5 hours)
Category: Interior Finish
Flooring side pieces made out of 3mm aircraft plywood and covered with Oratex (Super Cup yellow). Inserted with M3 screws into rivet nuts.
45C7A722-82DD-4CE4-80D6-951C98ABBEE9_1_105_c.jpeg
861AB702-7DCD-4A5A-9FD8-1215C65A2E21_1_105_c.jpeg
Sep 17, 2022
Seat adjuster
- (3.5 hours)
Category: Interior Finish
Seat adjustment pin with spring installed, holes for the adjustment drilled. Stop ring installed.
22ABEA2B-C106-465D-ADD6-9786B105A927_1_105_c.jpeg
Jun 18, 2022
Seats installed
- (4 hours)
Category: Interior Finish
Seat runners installed, seat adjuster rail installed, seat fitted into the fuselage.
227A5D35-77C1-4664-AF3C-4CCE7AC26C2B_1_105_c.jpeg
EDD37E3B-FB16-477F-86FA-379C034D7FC3_1_105_c.jpeg
Jun 13, 2022
Seat
- (4 hours)
Category: Interior Finish
Seats completed. Sheet metal for seat adapted, holes drilled, edges broken.
Apr 25, 2022
Seat Base
- (4 hours)
Category: Interior Finish
Process the sheet metal of the seat backrest: Drill holes for mounting (#30) and drill 9 holes (2") and deburr.
A4AC3C34-3333-4728-A52E-C1337C6521AC_1_105_c.jpeg
D8CD68E3-EB5D-4DC9-83A9-BCF9A0C59737_1_105_c.jpeg