EAA Builders Log Website
EMail address:
Password:
- Lost my password
close
EAA Builders Log
(An EAA website).
Help
Contact Us
About
Sign Up
Login
Project:
RANS21RB
-
Listing for Category : Engine
(Please mouse-over any icon to get a description of that function).
Categories
Show All Entries
- (679)
Research
Workshop
- (4)
Empennage
- (37)
Fuselage
- (155)
Firewall
- (19)
Tail Feathers
- (4)
Wings
- (99)
Controls
- (20)
Avionics
- (52)
Lighting
- (9)
Instrument Panel
- (8)
Landing Gear
- (6)
Engine
- (82)
Propeller
Fuel System
- (6)
Interior Finish
- (28)
Paint / Decals
- (90)
Inspection
- (4)
Tools
Inventory
- (3)
Kit Delivery
- (1)
Reassembly
- (52)
Builder Name:
Randall Brooks
-
Project:
Rans - S-21 Outbound
-
VIEW REPORTS
Total Hours:
1991
Total Flight Time:
Start/Last Date:
Apr 03, 2021 - No Finish Date
Engine:
Titan IO-340 180HP
Propeller:
Whirlwind
Friendly URL:
https://eaabuilderslog.org?s=RANS21RB
Home or Last Project Picture
Mar 17, 2023
Cowling
- (4.5 hours)
Category: Engine
Final trim and drilling of lower cowling for cleco attachment on rear edge. Ready for final sanding for rear edge paint line. Trimmed top cowling again closer to fit line. Sneaking up on it. Cut lower cowl air outlet. Didn't cut to latest text manual cut dimensions. Can open up further if needed after flight testing.
Lower Cowl fit and clecoed. Ready for fasteners and final gap sanding for paint (1).jpg
Lower Cowl fit and clecoed. Ready for fasteners and final gap sanding for paint (3).jpg
Lower cowl mod for air outlet.jpg
NOTE: This information is strictly used for the EAA Builders Log project within the
EAA organization
.
-
Policy
-
© Copyright 2024 Brevard Web Pro, Inc.