Project: RANS21RB   -  
            Listing for Category : tail feathers
    (Please mouse-over any icon to get a description of that function).


  
Builder Name:Randall Brooks   -  
Project:   Rans - S-21 Outbound   -   VIEW REPORTS
Total Hours:1961
Total Flight Time:
Start/Last Date:Apr 03, 2021 - No Finish Date
Engine:Titan IO-340 180HP
Propeller:Whirlwind
 
Friendly URL: https://eaabuilderslog.org?s=RANS21RB

Home or Last Project Picture

Jan 23, 2024     Stab fairing - (3.5 hours)       Category: Tail Feathers
Marked and drilled Aerosport Vertical Stab base fairing per drawing. Transfered to Stab and fuselage for rivnut install. Deburred holes and installed #8 RIVNUTS using red Loctite. Moved right wing from rotator to storage stands.


 
Sep 14, 2023     Vertical Stab Tip - (1.5 hours)       Category: Tail Feathers
Final riveting of vertical Stab tip.


 
Sep 14, 2023     Vertical Stab tip - (2 hours)       Category: Tail Feathers
Drilled Stab tip for rivets.


 
Apr 10, 2022     Initial Fitting of Horizontal and Vertical Stab - (3.2 hours)       Category: Tail Feathers
Match drilled and upsized 2 forward and 1 only rear spar holes on horizontal stab for mounting holes. Reamed to .249. Fit up of horizontal stab and elevator and attaching elevator push-pull tube so elevator can be set at neutral-- this will allow control stick assembly to be set at neutral pitch, that will allow AP pitch servo to marked and mounted at neutral position. Also test fit vertical stab rudder for first time. Marked and drilled AP pitch servo and permanently mounted.


 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.