EAA Builders Log Website
EMail address:
Password:
- Lost my password
close
EAA Builders Log
(An EAA website).
Help
Contact Us
About
Sign Up
Login
Project:
RANS21RB
-
Listing for Category : Fuselage
(Please mouse-over any icon to get a description of that function).
Categories
Show All Entries
- (679)
Research
Workshop
- (4)
Empennage
- (37)
Fuselage
- (155)
Firewall
- (19)
Tail Feathers
- (4)
Wings
- (99)
Controls
- (20)
Avionics
- (52)
Lighting
- (9)
Instrument Panel
- (8)
Landing Gear
- (6)
Engine
- (82)
Propeller
Fuel System
- (6)
Interior Finish
- (28)
Paint / Decals
- (90)
Inspection
- (4)
Tools
Inventory
- (3)
Kit Delivery
- (1)
Reassembly
- (52)
Builder Name:
Randall Brooks
-
Project:
Rans - S-21 Outbound
-
VIEW REPORTS
Total Hours:
1991
Total Flight Time:
Start/Last Date:
Apr 03, 2021 - No Finish Date
Engine:
Titan IO-340 180HP
Propeller:
Whirlwind
Friendly URL:
https://eaabuilderslog.org?s=RANS21RB
Home or Last Project Picture
Oct 24, 2021
GMU 11 and Rudder Cable Install
- (3.7 hours)
Category: Fuselage
Located and riveted Garmin GMU 11 Magnatometer per plans. Mounted GMU with stainless steel machine screws and lock nuts. Installed rudder cables and tailwheel steering cables. Still need to final tighten all rudder cable pulley hardware.
GMU 11 Install (1).jpg
GMU 11 Install (4).jpg
GMU 11 Install (5).jpg
GMU 11 Install (6).jpg
Rudder Cable Install (1).jpg
Rudder Cable Install (2).jpg
Rudder Cable Install (3).jpg
Rudder Cable Install (4).jpg
NOTE: This information is strictly used for the EAA Builders Log project within the
EAA organization
.
-
Policy
-
© Copyright 2024 Brevard Web Pro, Inc.