EAA Builders Log Website
EMail address:
Password:
- Lost my password
close
EAA Builders Log
(An EAA website).
Help
Contact Us
About
Sign Up
Login
Project:
RANS21RB
-
Listing for Category : Reassembly
(Please mouse-over any icon to get a description of that function).
Categories
Show All Entries
- (676)
Research
Workshop
- (4)
Empennage
- (37)
Fuselage
- (155)
Firewall
- (19)
Tail Feathers
- (4)
Wings
- (99)
Controls
- (20)
Avionics
- (52)
Lighting
- (9)
Instrument Panel
- (8)
Landing Gear
- (6)
Engine
- (82)
Propeller
Fuel System
- (6)
Interior Finish
- (28)
Paint / Decals
- (90)
Inspection
- (3)
Tools
Inventory
- (3)
Kit Delivery
- (1)
Reassembly
- (50)
Builder Name:
Randall Brooks
-
Project:
Rans - S-21 Outbound
-
VIEW REPORTS
Total Hours:
1988
Total Flight Time:
Start/Last Date:
Apr 03, 2021 - No Finish Date
Engine:
Titan IO-340 180HP
Propeller:
Whirlwind
Friendly URL:
https://eaabuilderslog.org?s=RANS21RB
Home or Last Project Picture
Mar 21, 2024
Flight controls and wingtip
- (2 hours)
Category: Reassembly
Mounted right aileron and flap. No helpers today so I used my patented shelf mounting method. Worked great. Did initial rigging of flaps. Installed right wing tip temporarily to check for fit with aileron. Trailing edge lines up great. Removed masking tape from silicone sealant on skylight. Still need to silicone seal the center hold-down strip between windscreen and skylight.
20240321_091843.jpg
20240321_100631.jpg
20240321_100653.jpg
20240321_114752.jpg
20240321_114812.jpg
20240321_114853.jpg
20240321_114942.jpg
20240321_140601.jpg
NOTE: This information is strictly used for the EAA Builders Log project within the
EAA organization
.
-
Policy
-
© Copyright 2024 Brevard Web Pro, Inc.