EAA Builders Log Website
EMail address:
Password:
- Lost my password
close
EAA Builders Log
(An EAA website).
Help
Contact Us
About
Sign Up
Login
Project:
RANS21RB
-
Listing for Category : Reassembly
(Please mouse-over any icon to get a description of that function).
Categories
Show All Entries
- (677)
Research
Workshop
- (4)
Empennage
- (37)
Fuselage
- (155)
Firewall
- (19)
Tail Feathers
- (4)
Wings
- (99)
Controls
- (20)
Avionics
- (52)
Lighting
- (9)
Instrument Panel
- (8)
Landing Gear
- (6)
Engine
- (82)
Propeller
Fuel System
- (6)
Interior Finish
- (28)
Paint / Decals
- (90)
Inspection
- (3)
Tools
Inventory
- (3)
Kit Delivery
- (1)
Reassembly
- (51)
Builder Name:
Randall Brooks
-
Project:
Rans - S-21 Outbound
-
VIEW REPORTS
Total Hours:
1990
Total Flight Time:
Start/Last Date:
Apr 03, 2021 - No Finish Date
Engine:
Titan IO-340 180HP
Propeller:
Whirlwind
Friendly URL:
https://eaabuilderslog.org?s=RANS21RB
Home or Last Project Picture
Mar 24, 2024
Rigging and final hardware tightening
- (3 hours)
Category: Reassembly
Safety wired 3 turnbuckles on aileron cables. Final tighten of all flap and aileron hardware and jam nuts. Applied torque seal. Set travel limits on elevator per manual. Marked, drilled and riveted stops in torque tube.
20240323_152205.jpg
20240324_111401.jpg
20240324_111408.jpg
20240320_133054.jpg
20240321_100648.jpg
20240321_100653.jpg
20240321_114812.jpg
NOTE: This information is strictly used for the EAA Builders Log project within the
EAA organization
.
-
Policy
-
© Copyright 2024 Brevard Web Pro, Inc.