Project: pchang   -  
            Last 30 Project Activities / Entries :
    (Please mouse-over any icon to get a description of that function).


  
Builder Name:Paul Chang   -  
Project:   Vans - RV-10   -   VIEW REPORTS
Total Hours:590.65
Total Flight Time:
Start/Last Date:Jun 22, 2022 - No Finish Date
 
Friendly URL: https://eaabuilderslog.org?s=pchang

Home or Last Project Picture

Mar 15, 2024     Sect 20: 20-4 Step 1 left wing - (.6 hour)       Category: Wings
Spliced together the wires for the regulator and fed it through the left wing conduit.


 
Mar 13, 2024     Sect 20: 20-4 Step 1left wing - (2.1 hours)       Category: Wings
Installed the conduit line for the left wing by drilling and riveting the conduit clips, Then installed the conduit and zipped tied it to the conduit clips. Ran the lines for the lighting and GAP 26 regulator. Primed and installed the regulator mount stiffeners and screwed them in place.


 
Mar 09, 2024     Sect 20; 20-5 Steps 3-9 Right wing - (5.5 hours)       Category: Wings
Clecko'd the wing skin onto the wing. Match drilled and deburred W-1005R wing skin.


 
Mar 05, 2024     Sect 20: 20-4 Step 1 left wing - (3.7 hours)       Category: Wings
Installed the autopilot, wires for zip tips and RF antennae on the right wing. Housed them in the conduit that I attached with vans wire clips. Ordered a few items for the installation: Garmin autopilot mounting kit, wire pliers, butt splices, and more non standard rivets. Looking ahead, I had to order 2X VA -162 because I did a horrible job installing it..


 
Feb 28, 2024     Sect 20: 20-4 ; step 5-6 - (2.4 hours)       Category: Wings
Riveted both the aileron and flap gap fairings to the wings.


 
Feb 27, 2024     Sect 20 ; 20-4 Step 4 - (1.75 hours)       Category: Wings
Dimpled and primed all the pieces including the inside of the tubes and brackets for the actuation in section 23


 
Feb 26, 2024     Sect 20; 20-4 step 2-4 - (2.3 hours)       Category: Wings
Cut out the stiffeners, deburred all the edges and holes, washed. Ready to prime.


 
Feb 18, 2024     Sect 20: 20-2 step 4-6 - (.6 hour)       Category: Wings
Going with the garmin GAP 26 regulated pitot tube with AOA. Installed the bushings and sleeve to both the AOA and Pitot line. Will have to come back to this to install the garmin mast and pitot on the wings.


 
Feb 17, 2024     ERFT; 12-14; Fuel tank test - (3.5 hours)       Category: Wings
Checked for leaks on the fuel tank and found a small leak. Borrowed a vacuum pump and put negative pressure in the tank and thinned out the proseal with a little ethanol. Using a syringe, pushed the proseal at the site of the leak and made sure there was ample amount of sealant to continue to draw proseal to seal the leak. It turned out well and then installed the tank to the wing.


 
Jan 10, 2024     ERFT; 12-14; steps 1-6 - (2.7 hours)       Category: Wings
Installed the baffling and the z brackets on the right fuel tank. Sealed with Proseal and riveted everything together. The work was done in a span of two weeks. Next up is to seal test.


 
Dec 17, 2023     Sect 23 - 2 Steps 1-4 through Sect 23-3 steps 1-2 - (4.8 hours)       Category: Wings
While the right fuel tank is curing. I started fabrication of the two torque tubes. Primed and installed the nut and o ring to each tube. Also started work on the bellcrank pushrod by cutting them to length and fitting the AN490HT8P. Just need to prime the insides before final riveting.


 
Dec 10, 2023     ERFT; 16-3; 13-14 steps 1-2 left - (2.7 hours)       Category: Wings
Spent 2 hours fitting the left ER fuel tank.


 
Nov 30, 2023     ERFT; 16-3; 7-14 steps 3-4 through 8-14 steps 6 - (3.1 hours)       Category: Wings
completed the inboard rib and all the attachments. Riveted and sealed off. Will allow a few days for the proseal to set up and then test.


 
Nov 27, 2023     ERFT; 16-3; 7-14 steps 1-2; continued - (4.2 hours)       Category: Wings
completed the riveting of all the tank nose ribs and also attached and riveted the tank j channel. Completed proseal sealing the rivet heads on all riveted rivets.


 
Nov 23, 2023     ERFT; 16-3; 7-14 steps 1-2 - (1.7 hours) Category: Wings
Prepped and installed/riveted the first 2 ribs on the inboard side of the right fuel tank. Very messy and time consuming work that is also time sensitive....
 
Nov 14, 2023     ERFT; 16-3; 6-14 steps 1-2 - (2.2 hours)       Category: Wings
Cleaned the stiffeners with alcohol and riveted them to the skin using Proseal. Also installed the fuel cap flange and the VA-112 fuel drain flange.


 
Nov 12, 2023     ERFT; 16-3; 4-14 through 5-14 steps 1-8 - (14.7 hours)       Category: Wings
completed all the steps on page 5. Took the entire weekend to do. Summary of work was working on the J stiffiner, baffling, and dimpling of the skin. Also attached the parts to the ribs that is associated with the gas plugs. Also ordered more Proseal


 
Nov 09, 2023     ERFT; 16-3; 4-14 Right tank skin deburr and scuffing of holes - (2 hours)       Category: Wings
Tedious work that had to be done, I deburred all the inside holes and scuffed up the inside tank skin.


 
Nov 05, 2023     ERFT; 16-3; 12-14 steps 1-6 Left Tank - (4.2 hours)       Category: Wings
Installed the baffling using rivets and proseal called out in the instructions. After curing for 2 days, I went in and installed the z brackets. Then I countersunk and riveted the 10 #40 holes aligning the skin to the baffling. 1 tank done!


 
Oct 25, 2023     ERFT; 16-3; 2-14 steps 1-6; right tank - (2.7 hours)       Category: Wings
Same process as the left wing tank. Deburred, cramped, final drill, and deburred the holes on all the tank ribs.


 
Oct 23, 2023     ERFT; 16-3; 9-14 steps 1-3 - (3.7 hours)       Category: Wings
Installed the fuel sender, then cleaned up the inside of the tanks a bit.


 
Oct 21, 2023     ERFT; 16-3; 8-14 steps 1-6 - (4.5 hours)       Category: Wings
installed the aluminum vent line and the riveted the inboard ribs to attach those vent lines. Applied sealant.


 
Oct 18, 2023     ERFT; 16-3; 7-14 steps 1-3 - (11.7 hours)       Category: Wings
Took most of the week to install the tank ribs. I only had a 2 hour window to install 3 ribs starting from when I mix the proseal. In a 2 hour window, i was able to install 3 tank ribs. This includes putting the proseal on the rib flanges, place the ribs into the skin, cleco 3 on each side, rivet them in place, and finally putting proseal on the rivets inside. I also completed installing the J Stiffeners using the same method. Lastly, I also installed the T-1005 tank attachech bracket subassembly onto the tank, also using the same method of proseal, riveting, and presealing the rivets on the inside.


 
Oct 10, 2023     ERFT; 16-3; 5-14 steps 7-8 through 6-14 steps 1-2 - (8.8 hours)       Category: Wings
riveted and prosealed the t-1010 anti rotation plate and the VA-141 fuel flange. Riveted the K100-3 nutplates. On the tank skins, applied proseal and riveted on all the tank stiffeners and both the fuel cap flange with the vent line clip. Lastly pro sealed and riveted drain flange.


 
Oct 01, 2023     Finished up the forward edge - (1.7 hours)       Category: Wings
Finished up riveting the forward edge and any remaining ER fuel tank brace on the wing spar. Also screwed down the aftermarket aileron brackets from sky designs engineering.


 
Sep 27, 2023     EFRT 16-3-5 Steps 1-5 - (1.8 hours)       Category: Wings
Completed the shims prep work and riveted them in place, installed the VA-146 flange bearing. Got shipment of nuts and washers from aircraft spruce and was able to complete the sky design aftermarket aileron brackets as well as sizing the hole for the vent line bracket.


 
Sep 25, 2023     Rivets, pneumatic puller, nuts Category: Tools
 