Project: rtardiff   -  
            Listing for Category : brakes
    (Please mouse-over any icon to get a description of that function).


  
Builder Name:Richard Tardiff   -  
Project:   Bearhawk - Patrol   -   VIEW REPORTS
Total Hours:2319.25
Total Flight Time:0.7
Total Expense:$39.00
Start/Last Date:Aug 10, 2019 - No Finish Date
Engine:Lycoming 0360
 
Friendly URL: https://eaabuilderslog.org?s=rtardiff

Home or Last Project Picture

Jan 17, 2022     MORE BRAKE LINES - (8.5 hours) Category: Brakes
COMPLETED THE FLEX. LINES (AEROQUIP 303) FROM THE MASTER CYLINDERS AND PARKING BRAKE VALVES TO THE GEAR LEGS.
 
Jan 11, 2022     Parking Brake & Reservoir - (5 hours)       Category: Brakes
Temporarily installed brake fluid reservoir on the hot side of the firewall. Temporarily attached parking brake valve on the aft side. Spent quite a while looking for items stashed before my break and sorting out the various sizes of the required AN fittings.


 
Jan 10, 2022     Gotta Stop - (6 hours)       Category: Brakes
Following an extended search for a missing fitting, I reattached the fluid lines in the gear legs. I then assembled, using the manufacturers instructions, a 13" flexible line (Aeroquip 303) to run from the master cylinder to the gear leg.


 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.