EAA Builders Log Website
EMail address:
Password:
- Lost my password
close
EAA Builders Log
(An EAA website).
Help
Contact Us
About
Sign Up
Login
Project:
rtardiff
-
Listing for Category : paint booth
(Please mouse-over any icon to get a description of that function).
Categories
Show All Entries
- (515)
Research
- (32)
Workshop
- (39)
Empennage
- (3)
Fuselage
- (25)
Firewall
- (2)
Tail Feathers
- (14)
Wings
- (99)
Controls
- (36)
Avionics
Lighting
Instrument Panel
- (2)
Landing Gear
- (9)
Engine
- (8)
Propeller
- (8)
Fuel System
- (29)
Interior Finish
- (22)
Paint / Decals
- (33)
Inspection
- (6)
Tools
- (5)
Bootcowl
- (30)
R&R
- (4)
Covering
- (46)
Brakes
- (3)
Windows
- (11)
Instruments
- (3)
Paint Booth
- (9)
Paint Prep.
- (21)
Cowling
- (16)
Builder Name:
Richard Tardiff
-
Project:
Bearhawk - Patrol
-
VIEW REPORTS
Total Hours:
2319.25
Total Flight Time:
0.7
Total Expense:
$39.00
Start/Last Date:
Aug 10, 2019 - No Finish Date
Engine:
Lycoming 0360
Friendly URL:
https://eaabuilderslog.org?s=rtardiff
Home or Last Project Picture
Apr 01, 2023
Door
- (1.5 hours)
Category: Paint Booth
Built a door for the paint booth.
Mar 17, 2023
Color (?) Coat, Part I
- (4.5 hours)
Category: Paint Booth
Shot 1one side gear leg & horizontal w. white "color" coat.
Mar 15, 2023
It's cold outside!
- (2 hours)
Category: Paint Booth
With temperatures hovering in the mid-thirties, and needing to keep the hangar door partially open to exhaust paint fumes, I hung poly sheeting along the bottom and in the open portion along the side. Duct tape is essential.
Sep 19, 2022
PAINT BOOTH EXPANSION
- (2 hours)
Category: Paint Booth
EXTENDED LENGTH OF PAINT BOOTH BY 24 INCHES.
Sep 01, 2022
Escape hatch
- (4 hours)
Category: Paint Booth
Attached a door of sorts to entry area, just large enough to roll fuselage or wings in and out.
Aug 31, 2022
Clean Air
- (2 hours)
Category: Paint Booth
Framed openings at the top of the booth for 4 furnace filters. Will experiment with various combinations of fan speed and number of filters to determine what works best.
Aug 29, 2022
Fans
- (3 hours)
Category: Paint Booth
Added three 20" box fans to pull air out of the booth.
IMG_1971.jpeg
Aug 22, 2022
Carpentry
- (11 hours)
Category: Paint Booth
Laid out, framed and covered paint booth with 6 mil. poly. Used one side of hangar for wall.. Hung 12 led light strips on side and top.
IMG_1961.jpeg
Jul 19, 2022
Town Run
- (4 hours)
Category: Paint Booth
Drove into Missoula to secure 2X4, polyethylene sheeting, box fans, air filters for paint booth.
NOTE: This information is strictly used for the EAA Builders Log project within the
EAA organization
.
-
Policy
-
© Copyright 2024 Brevard Web Pro, Inc.