Project: rtardiff   -  
            Listing for Category : covering
    (Please mouse-over any icon to get a description of that function).


  
Builder Name:Richard Tardiff   -  
Project:   Bearhawk - Patrol   -   VIEW REPORTS
Total Hours:2319.25
Total Flight Time:0.7
Total Expense:$39.00
Start/Last Date:Aug 10, 2019 - No Finish Date
Engine:Lycoming 0360
 
Friendly URL: https://eaabuilderslog.org?s=rtardiff

Home or Last Project Picture

Jul 16, 2022     Gear Legs.5 - (1.5 hours) Category: Covering
Ironed finish tapes
 
Jul 15, 2022     Gear legs.4 - (3 hours) Category: Covering
Applied finish tape and attached inspection rings @ brake line fittings.
 
Jul 14, 2022     Gear legs.3 - (6 hours) Category: Covering
Finished covering g. legs. Shrunk fabric @ 250-300-350. Marked and laid down adhesive for finish tapes.
 
Jul 13, 2022     Gear legs.2 - (6 hours) Category: Covering
Applied Ceconite on gear legs.
 
Jul 12, 2022     Gear Legs - (2 hours) Category: Covering
laid down 2 coats of thinned adhesive (2:1) at attach points on gear legs
 
Jul 11, 2022     Ironing.2 - (7 hours) Category: Covering
Continued ironing finish tapes.
 
Jul 09, 2022     Ironing - (3 hours) Category: Covering
Began ironing finish tapes using 250 F iron.
 
Jul 08, 2022     Fuselage Tapes - (6 hours)       Category: Covering
Continued applying tapes to fuselage @ wear points.


 
Jul 07, 2022     Finish Tapes - (5 hours) Category: Covering
Began marking glue lines for finish tapes @ formers and longhorns.
 
Jul 07, 2022     More shrinking; Rotisserie Revisited - (5.5 hours)       Category: Covering
Shrink bottom fabric @. 250-300-350. Began rebuilding a rotisserie using 1" pipe flanges &. 2X4's.


 
Jul 06, 2022     Rotisserie - (3 hours)       Category: Covering
Mounted fuselage on rotisserie @ firewall. Removed landing gear.


 
Jul 06, 2022     Finish Tapes - (4 hours) Category: Covering
Finished applying tapes on top & sides of fuselage
 
Jul 05, 2022     Finish tapes.6 - (5 hours) Category: Covering
Continued with tapes
 
Jul 01, 2022     Finish Tapes.5 - (6 hours) Category: Covering
Began applying finish tapes @ all (potential) wear points on fuselage, beginning with vertical stab.
 
Jun 28, 2022     Finish Tapes.4 - (5 hours) Category: Covering
Continued applying thinned glue (2 coats) for finish tapes at all wear points
 
Jun 27, 2022     Finish Tapes.3 - (6 hours) Category: Covering
Applied adhesive @ vertical stab. & top- of fuselage in preparation for finish tapes.
 
Jun 24, 2022     Finish Tapes.2 - (3 hours) Category: Covering
Continued marking glue lines
 
Jun 21, 2022     Bottom side & cable fairings - (4.5 hours)       Category: Covering
Glued fabric to bottom of fuselage. Used 1/2" magnets to hold fabric to longerons. Much easier than spring clamps.
Glued fairings @ cable exit points.


 
Jun 20, 2022     Inspection Openings, Glue, Call Fairings - (5 hours)       Category: Covering
Cleaned up the fabric around inspection openings. Applied 2 coats of thinned adhesive on bottom longhorns, in preparation for attaching fabric on bottom. Primed cable fairings.


 
Jun 17, 2022     Trim and fit - (3 hours)       Category: Covering
Continued cleaning up around the edges


 
Jun 17, 2022     More trimming Category: Covering
 
Jun 16, 2022     Inspection opening - (4 hours)       Category: Covering
Glued .020 frame @ horizontal stab. location. Both sides. Will provide access for install and inspection of elevator & trim control attach points.


 
Jun 15, 2022     inspection plates - (4 hours)       Category: Covering
Researched and fabricated backing plates for access openings @ horizontal stabilizer.


 
Jun 14, 2022     Trim and fit - (3 hours) Category: Covering
Worked around the fuselage, trimming fabric as needed.
 
Jun 09, 2022     Final Shrink - (3 hours)       Category: Covering
Continued shrinking. Iron @ 350 F.


 
Jun 08, 2022     More shrinking - (6 hours)       Category: Covering
Continued shrinking. Iron @ 300 F


 
Jun 07, 2022     Incredible Shrinking Ceconite - (7.5 hours)       Category: Covering
Shrunk fabric top & sides using 250 F iron. Glued fabric to left forward section (pilot cockpit).


 
Jun 06, 2022     Top & Sides - (6.5 hours)       Category: Covering
Attached semi-envelope to top and sides. Glue @ bottom longerons. Fitting fabric into rear window channels was tedious, but not especially difficult.


 
Jun 04, 2022     Fuselage Envelope - (4 hours)       Category: Covering
Fit and glued fabric @ rear windows. Fabric is inserted in channel such that window will trap it, in addition to the glue. 3/4 x 1/16 aluminum bar, rounded at corners, makes a nice tool for fitting the fabric into the channels.


 
Jun 03, 2022     Reinforcement & patches - (3 hours) Category: Covering
Cut and fit patches and reinforcements at strategic areas, interior fabric.
 
Jun 02, 2022     Glue - (3 hours) Category: Covering
Applied Air Tech UA 55 to rear window frames, top former, and longhorns in preparation for installing fuselage fabric. Began gluing fuselage envelope, starting with the "backbone". or top former and vertical stab.
 
Feb 03, 2022     Pre-Cover Details - (2 hours)       Category: Covering
Cut templates to assist in locating rudder cable exit holes @ rear of fuselage.


 
Oct 05, 2021     Finish Tapes - (4 hours)       Category: Covering

Re-do finish tapes-elevators
Install center stringer


 
Oct 04, 2021     Elevators - (4 hours) Category: Covering

Attach and iron finish tapes—elevators

 
Aug 31, 2021     Trim actuators - (5 hours)       Category: Covering
Opened skin to accomodate the trim actuators on both sides of the horizontal stabilizer. Will add slotted aluminum cover before prepping for paint. Completed finish tapes on tail feathers


 
Aug 26, 2021     Tail Feathers.3 - (10 hours) Category: Covering
More marking and finish taping over two days
 
Aug 25, 2021     Tail Feathers.2 - (7 hours)       Category: Covering
Continued with finish tape on tail feathers-


 
Aug 23, 2021     Tail Feathers - (2.5 hours)       Category: Covering
Marked and taped tail feathers.


 
Aug 13, 2021     Finish Tapes - (18.5 hours)       Category: Covering
Marked & taped finish tapes over rib stitching--ailerons & elevators---over 4 days and 18.5 hours


 
Aug 09, 2021     More rib stitching - (18.5 hours)       Category: Covering
Took a little road trip to the east coast. Having gotten that out of my system, returned to the important work of rib stitching the horizontal stabilizer and rudder-18.5 hours over three days.


 
Jul 13, 2021     Rib stitch - (9 hours)       Category: Covering
Over two days, prepped and rib stitched tail feathers.


 
Jul 09, 2021     Tail Feathers - (14 hours) Category: Covering
Over three days, ironed tail feathers. @ 250, 300, 375 degrees
 
Jul 05, 2021     more tape - (9.5 hours) Category: Covering
Finish tape ailerons and flaps
 
Jul 04, 2021     Tape - (7 hours) Category: Covering
Applied finish tape to flaps
 
Jul 03, 2021     Tape & Iron - (6 hours) Category: Covering
Finish tape & iron ailerons
 
Jun 23, 2021     Ailerons - (4.5 hours) Category: Covering
Finish tape on ailerons.
 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.