EAA Builders Log Website
EMail address:
Password:
- Lost my password
close
EAA Builders Log
(An EAA website).
Help
Contact Us
About
Sign Up
Login
Project:
rtardiff
-
Listing for Category : fuselage
(Please mouse-over any icon to get a description of that function).
Categories
Show All Entries
- (515)
Research
- (32)
Workshop
- (39)
Empennage
- (3)
Fuselage
- (25)
Firewall
- (2)
Tail Feathers
- (14)
Wings
- (99)
Controls
- (36)
Avionics
Lighting
Instrument Panel
- (2)
Landing Gear
- (9)
Engine
- (8)
Propeller
- (8)
Fuel System
- (29)
Interior Finish
- (22)
Paint / Decals
- (33)
Inspection
- (6)
Tools
- (5)
Bootcowl
- (30)
R&R
- (4)
Covering
- (46)
Brakes
- (3)
Windows
- (11)
Instruments
- (3)
Paint Booth
- (9)
Paint Prep.
- (21)
Cowling
- (16)
Builder Name:
Richard Tardiff
-
Project:
Bearhawk - Patrol
-
VIEW REPORTS
Total Hours:
2319.25
Total Flight Time:
0.7
Total Expense:
$39.00
Start/Last Date:
Aug 10, 2019 - No Finish Date
Engine:
Lycoming 0360
Friendly URL:
https://eaabuilderslog.org?s=rtardiff
Home or Last Project Picture
Jul 06, 2023
Doors
- (4 hours)
Category: Fuselage
Assemble and hang cargo & pilot doors
Jun 20, 2023
Seat Tracks
- (4 hours)
Category: Fuselage
After much dithering and cogitation, worked up the courage to drill the seat tracks. Anticlimax defined.
Jun 07, 2023
Cargo Door
- (4 hours)
Category: Fuselage
Drilled, demurred, etc. Attached skin to cargo door using pulled rivets.
Aug 03, 2022
Door Trim
- (3 hours)
Category: Fuselage
Cleaned up door frames. Drilled to 1/8". for rivets.
Apr 02, 2022
Metal Prep
- (11 hours)
Category: Fuselage
Removed aluminum parts. Scuffed with Scotchbrite pad, Acid etched and alodined, using Bonderite C-IC 33 and Bonderite M-CR 1201 AERO.
Feb 23, 2022
Pre-Cover preparation
- (6 hours)
Category: Fuselage
Using pasteboard templates, and old bedsheet, and scraps of Ceconite, I practiced fitting fabric at various points in the cockpit area. Looks like lots of notching and fitting. Should be fun.
Feb 22, 2022
Windows & Doors
- (2 hours)
Category: Fuselage
Researched fit & trim options for installing doors and windows.
Oct 22, 2021
SKYLIGHT FRAME
- (4 hours)
Category: Fuselage
Fabricate frame for skylight using kit parts and uminum angle
SKY2.jpeg
SKYFRAME.jpeg
Oct 20, 2021
Skylight FRAME
- (4.5 hours)
Category: Fuselage
Fabricate frame for skylight using kit parts and inum angle
Oct 14, 2021
Window Frames
- (8 hours)
Category: Fuselage
Attach frames for rear windows
window frame.jpeg
Oct 13, 2021
Fabric: Fuselage
- (6 hours)
Category: Fuselage
Trim fabric—fuselage
Re-hang ailerons
Research window placement
fuse fabric.jpeg
Oct 12, 2021
Fabric--Fuselage
Category: Fuselage
Measure and fit fabric—fuselage
Mark seam @ top center stringer w. straight pins
Reattach hinges—ailerons
5
fuse fab.jpeg
Jun 01, 2021
Bootcowl/Windscreen
- (2.5 hours)
Category: Fuselage
Attached boot cowl to fuselage with clicos ; test-fit windscreen
64443523544__7881054D-5325-4276-9F7E-4A4039D8655D.jpeg
Sep 11, 2020
Getting Ready to Cover 1
- (1 hour)
Category: Fuselage
Pulled elevators off.
Sep 03, 2020
Nutplates
- (4 hours)
Category: Fuselage
Replaced a dozen or more nutplates with unsatisfactory rivet heads.
Sep 02, 2020
Reassembly, continued
- (2 hours)
Category: Fuselage
Reworked front throttle attach. Researched Lyc. OI360.
Sep 01, 2020
Reassembly, continued
- (6 hours)
Category: Fuselage
Reworked left fuel line. Rebuilt rear throttle attachment. Reworked trim attachment. (With the benefit of time and a bit more experience, i rebuilt the throttle and trim attachments such that I believe both will be more secure.
IMG_0932.jpg
Jun 16, 2020
Doors.3
- (3.5 hours)
Category: Fuselage
Finished fitting skin to main door.
++11ly4eQte4a0HISgb6%w.jpg
Jun 15, 2020
Doors.2
- (5 hours)
Category: Fuselage
Put donor plane in the hangar in preparation for enginectomy. Continued fitting and drilling cargo bay door. Started on main door--bottom.
aTZANu%hQMSFoqyt+ZLGJQ.jpg
Jun 13, 2020
Doors.1
- (3 hours)
Category: Fuselage
Fit & trimmed cargo bay door.
2YzgOrYgSlKo3Xms2sJkXQ.jpg
Jun 09, 2020
Do-Overs Are Fun
- (3 hours)
Category: Fuselage
In preparation for final assembly, removed firewall. Built a scaffolding to use in raising fuselage. Removed landing gear. Tomorrow, will disassemble and inspect the shock struts, both of which have leaked from day one.
ehyLOpjzSceMW41%gYnZWQ.jpg
Apr 24, 2020
Pitot tube mount.3
- (02 hours)
Category: Fuselage
Installed pitot mast at rear spar.
Aug 26, 2019
Aluminum formers.2
- (4 hours)
Category: Fuselage
Finished installing formers as above.
IMG_0391.jpg
Aug 24, 2019
Aluminum formers.1
- (4 hours)
Category: Fuselage
Fit aluminum formers to sides, bottom of fuselage. Attached using pulled rivets.
g7sDwhPFQA2pbIjO1pPT7g.jpg
Aug 23, 2019
Floor boards
- (6 hours)
Category: Fuselage
Fit floor boards from firewall aft. Drilled through tabs to accept 3/16 in. screws & tinnermans.
KBTcn52pRZWeOzi4iyap5Q.jpg
QTjlT+0qSsuW6ZsjFNwlkA.jpg
a%Z1jeNqR%+VHb1M5PwZaA.jpg
zOd%hTinQKGVUpHGJy02rA.jpg
NOTE: This information is strictly used for the EAA Builders Log project within the
EAA organization
.
-
Policy
-
© Copyright 2024 Brevard Web Pro, Inc.