Project: rtardiff   -  
            Listing for Category : landing gear
    (Please mouse-over any icon to get a description of that function).


  
Builder Name:Richard Tardiff   -  
Project:   Bearhawk - Patrol   -   VIEW REPORTS
Total Hours:2319.25
Total Flight Time:0.7
Total Expense:$39.00
Start/Last Date:Aug 10, 2019 - No Finish Date
Engine:Lycoming 0360
 
Friendly URL: https://eaabuilderslog.org?s=rtardiff

Home or Last Project Picture

May 08, 2021     Parts Order - (1.5 hours) Category: Landing Gear
Ordered tubing & Aeroquip fittings along with a ferule for assembling brake lines.
 
May 07, 2021     Brakes - (4 hours)       Category: Landing Gear
Worked out schematic for brake system.


 
Jun 18, 2020     Reassembly - (5 hours) Category: Landing Gear
Reinstalled control torque tube, landing gear. Attached firewall and tunnel w. cloches. Measured length for flex. brake tube-master cylinder to brake caliper.
 
Jun 17, 2020     Brake Lines - (4.5 hours)       Category: Landing Gear
Installed 1/4" hard lines in landing gear. Did a bit of cleanup.


 
Jun 10, 2020     Shock Struts Revisited - (6 hours) Category: Landing Gear
Disasembled and inspected shock struts to determine cause of slow leak. Turned out to be a missing o-ring on the inside of the bronze top cap. Said O-rings were right where I left them, clearly labeled and stowed. Unfortunately, the piston that is located at the center of the strut loosened as I was compressing the spring per the BH Manual, thus precluding my using the "socket method." I spent several hours fabricating and fitting a clamp out of scrap steel and threaded rods to compress the spring. First strut, then, took four and a half hours. The second took half an hour! Note: There's no substitute for quality tools. My hardware store snap ring pliers were simply not up to the task. Borrowed a Snap-On plier from a friend and got the job done quickly!
 
Jun 05, 2020     Brake System, Part 1 - (3 hours) Category: Landing Gear
Inventoried and stored hardware order, including AN fittings needed for brake lines and fuel gauge.

Attached brake fluid reservoir on right side of firewall, just to see how it would look.
 
Dec 17, 2019     Throttle Quadrant - (06 hours) Category: Landing Gear
Using aluminum square tubing, fabricated mount for 3-LEVER CT83F QUADRANT and 1 LEVER QUADRANT (Front: ACS 05-00703 and Rear ACS 05-04531) Drilled, deburred, & Clecoed @ preinstalled tabs, left fuselage.
 
Aug 28, 2019     Gear Legs - (2 hours)       Category: Landing Gear
Attached gear legs.


 
Aug 10, 2019     Shock Struts - (6 hours)       Category: Landing Gear
Assembled shock struts per Builder's Assistance Manual (BAM) and drawing # 28.
��eburred and polished inside of strut tube with emery cloth
��ubricated O-rings
��nstalled spring to shaft using bolt-socket method
As noted in BAM, installation of snap rings was a challenge


 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.