Project: rtardiff   -  
            Listing for Category : Cowling
    (Please mouse-over any icon to get a description of that function).


  
Builder Name:Richard Tardiff   -  
Project:   Bearhawk - Patrol   -   VIEW REPORTS
Total Hours:2319.25
Total Flight Time:0.7
Total Expense:$39.00
Start/Last Date:Aug 10, 2019 - No Finish Date
Engine:Lycoming 0360
 
Friendly URL: https://eaabuilderslog.org?s=rtardiff

Home or Last Project Picture

Sep 14, 2023     Two steps back - (5 hours)       Category: Cowling
Not sure what I missed in the instructions, but I found that, having cut the top cowling section down to the 13" width, I was left with a gap between the top and bottom sections that was to great for the door panels supplied in the kit. Accordingly, I sourced a larger piece of .032 aluminum and made a large (21 " wide) panel. Replaced the piano hinges, etc.


 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.