EAA Builders Log Website
EMail address:
Password:
- Lost my password
close
EAA Builders Log
(An EAA website).
Help
Contact Us
About
Sign Up
Login
Project:
N64BN
-
Listing for Category : lighting
(Please mouse-over any icon to get a description of that function).
Categories
Show All Entries
- (1084)
Workshop
- (9)
Empennage
- (120)
Wings
- (274)
Fuselage
- (397)
Avionics
- (94)
Instrument Panel
- (6)
Lighting
- (5)
Engine
- (4)
Tools
- (1)
Firewall Forward
- (19)
Finishing
- (103)
Miscellaneous
- (16)
Practice
- (4)
Shop Supplies
- (8)
Training
- (3)
None
- (2)
Firewall
- (6)
Tail Feathers
Interior Finish
Propeller
Fuel System
Paint / Decals
Inspection
Controls
Landing Gear
Research
Workshop and Supplie
- (10)
Builder Name:
Bjorn Nilberg
-
Project:
Vans - RV-7
-
VIEW REPORTS
Total Hours:
2193.5
Total Flight Time:
1
Start/Last Date:
Aug 15, 2013 - No Finish Date
Engine:
Superior IO-360
Panel:
Garmin G3x
Friendly URL:
https://eaabuilderslog.org?s=N64BN
Home or Last Project Picture
Jan 23, 2020
Duplicated holder for landing/taxi lights
- (2 hours)
Category: Lighting
I had only one landing light bracket, but I also had a blank one. So I transferred the measurements and duplicated a 2nd.
I'm going on a long international mystery business trip, so no building for a while.
Transfer of measurements
Cloned
Jan 11, 2020
Vent angles
- (1 hour)
Category: Lighting
The panel “ears” that holds the vents need angles. I already had them made a way back, but I need to make room for the vents and drill them to the panel ears. This is also where I plan to put the headphone/mic jack and maybe a LEMO plug as there is plenty of room for it.
F1800DC8-3894-4DEF-BC0F-4B1B043AD776.jpeg
7AC34EBC-B218-4374-9993-C1E8EEAB19EF.jpeg
01BFA356-6AAB-4FDB-8398-437EACF489CB.jpeg
Aug 15, 2018
Beacon stiffener
- (2.00 hours)
Category: Lighting
Riveted the beacon stiffener
FP21092018A0007R.jpg
Aug 11, 2018
Beacon fitting
- (1.00 hour)
Category: Lighting
Drilled and made a stiffener for the beacon.
FP21092018A0007M.jpg
Aug 11, 2018
Primed the beacon stiffener
- (1.00 hour)
Category: Lighting
Primed the beacon stiffener
FP21092018A0007O.jpg
NOTE: This information is strictly used for the EAA Builders Log project within the
EAA organization
.
-
Policy
-
© Copyright 2024 Brevard Web Pro, Inc.