Project: N64BN   -  
            Listing for Category : lighting
    (Please mouse-over any icon to get a description of that function).


  
Builder Name:Bjorn Nilberg   -  
Project:   Vans - RV-7   -   VIEW REPORTS
Total Hours:2193.5
Total Flight Time:1
Start/Last Date:Aug 15, 2013 - No Finish Date
Engine:Superior IO-360
Panel:Garmin G3x
 
Friendly URL: https://eaabuilderslog.org?s=N64BN

Home or Last Project Picture

Jan 23, 2020     Duplicated holder for landing/taxi lights - (2 hours)       Category: Lighting
I had only one landing light bracket, but I also had a blank one. So I transferred the measurements and duplicated a 2nd.
I'm going on a long international mystery business trip, so no building for a while.


 
Jan 11, 2020     Vent angles - (1 hour)       Category: Lighting
The panel “ears” that holds the vents need angles. I already had them made a way back, but I need to make room for the vents and drill them to the panel ears. This is also where I plan to put the headphone/mic jack and maybe a LEMO plug as there is plenty of room for it.


 
Aug 15, 2018     Beacon stiffener - (2.00 hours)       Category: Lighting
Riveted the beacon stiffener


 
Aug 11, 2018     Beacon fitting - (1.00 hour)       Category: Lighting
Drilled and made a stiffener for the beacon.


 
Aug 11, 2018     Primed the beacon stiffener - (1.00 hour)       Category: Lighting
Primed the beacon stiffener


 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.