EAA Builders Log Website
EMail address:
Password:
- Lost my password
close
EAA Builders Log
(An EAA website).
Help
Contact Us
About
Sign Up
Login
Project:
N64BN
-
Listing for Category : practice
(Please mouse-over any icon to get a description of that function).
Categories
Show All Entries
- (1084)
Workshop
- (9)
Empennage
- (120)
Wings
- (274)
Fuselage
- (397)
Avionics
- (94)
Instrument Panel
- (6)
Lighting
- (5)
Engine
- (4)
Tools
- (1)
Firewall Forward
- (19)
Finishing
- (103)
Miscellaneous
- (16)
Practice
- (4)
Shop Supplies
- (8)
Training
- (3)
None
- (2)
Firewall
- (6)
Tail Feathers
Interior Finish
Propeller
Fuel System
Paint / Decals
Inspection
Controls
Landing Gear
Research
Workshop and Supplie
- (10)
Builder Name:
Bjorn Nilberg
-
Project:
Vans - RV-7
-
VIEW REPORTS
Total Hours:
2193.5
Total Flight Time:
1
Start/Last Date:
Aug 15, 2013 - No Finish Date
Engine:
Superior IO-360
Panel:
Garmin G3x
Friendly URL:
https://eaabuilderslog.org?s=N64BN
Home or Last Project Picture
Aug 17, 2018
Assisted another builder
Category: Practice
Assisted another builders first engine start. That was fun, but not without complications.
Oct 04, 2014
Pulling Engine
Category: Practice
Pulled an engine off an friends plane. Good introduction to power plant mechanics.
Aug 29, 2013
Finishing Toolbox
- (3.00 hours)
Category: Practice
Finished the first practice kit from Van's. Squeezing is easy, but I need a lot of more practice with the rivet gun before attacking real aircraft parts.
FP06022018A00012.jpg
FP06022018A00013.jpg
Aug 28, 2013
Riveting practice (Toolbox)
- (3.00 hours)
Category: Practice
Started to build Vans training project, the Toolbox. Using the pneumatic dimpler and squeezer was super easy. The rivet gun not so much. Definitely needed the rivet gun training.
NOTE: This information is strictly used for the EAA Builders Log project within the
EAA organization
.
-
Policy
-
© Copyright 2024 Brevard Web Pro, Inc.