Project: Utah-Jay   -  
            Listing for Category : lighting
    (Please mouse-over any icon to get a description of that function).


  
Builder Name:JAY TOWNSEND   -  
Project:   Companion   -   VIEW REPORTS
Total Hours:1317.5
Total Flight Time:
Total Expense:N/A
Start/Last Date:Oct 21, 2021 - No Finish Date
Engine:Barrow Lycoming O-360
Propeller:Sensenich 82” GA
Panel:Dynon
 
Friendly URL: https://eaabuilderslog.org?s=Utah-Jay

Home or Last Project Picture

Feb 08, 2024     Wing Tip Light Base - (2 hours)       Category: Lighting
I used carbon fiber to create a base for the light


 
Feb 21, 2023     Left Wing wiring. - (4 hours)       Category: Lighting
Left wing wires are all plugged into the D-Subs
Ignition key switch ground and power were added
EMS wire routing laid out and ready to me connected


 
Feb 20, 2023     Right wing/Fuselage end wiring - (6 hours)       Category: Lighting
Measured and fished the right wing wires down the sleeve in front of the right door frame. All were 18 ga. shielded wires, the landing lights and wingtip lights were 4 conduit, GoPro power supply was a single shielded 18 gauge. My pins that load into my D-Subs only allow for 20-22ga. so I had to splice in 22 ga. wire using solder splices, all connections were finished in heat shrink tube for a nice clean look. Grounds were made using the shielding and a solder spliced pigtail.

Final routing for the EMS wires was made, right side will be routed from the left to right along the firewall using adel clamps. EMS wires for EGT's and CHT's will be routed down the engine mount to avoid clutter and create working space in the future


 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.