Total Hours:1317.5
Total Flight Time:
Total Expense:N/A
Start/Last Date:Oct 21, 2021 - No Finish Date
Engine:Barrow Lycoming O-360
Propeller:Sensenich 82” GA
Panel:Dynon
 
Friendly URL: https://eaabuilderslog.org?s=Utah-Jay

Home or Last Project Picture

Feb 26, 2023     Data plate installation - (1 hour)       Category: Fuselage
Made backing for the data plate, glued it to the inside of the fabric under the left horizontal, drilled holes for data plate


 
Feb 06, 2023     Sky Light - (2 hours) Category: Fuselage
Bolted down the left sky light
 
Jan 15, 2023     Installed screws on the right center and skylight overhead - (3 hours)       Category: Fuselage
Took hours to install about 25 screws. I used nylon washers, crush washer and acorn nuts


 
Jan 11, 2023     Installed Skylights - (4 hours)       Category: Fuselage
I applied weatherstripping on the three sides that fit into the channels, weatherstripping under outside section more for cushion than weather. Had to tap them in with a rubber mallet as the fit was very tight. I used I/16th” nylon washers under the glass and inside the channel to put upward pressure on the glass so the weatherstripping would press against the channel. They will bolted in when the center metal section is installed


 
Jan 05, 2023     Reinforcement patch on handle area - (2 hours)       Category: Fuselage
Added reinforcement patch by using a 3” tape to bolster the durability of the handle area on both sides


 
Jan 03, 2023     Door Windows and Skins - (5 hours)       Category: Fuselage
Finally finished upsizing the holes in the Lexan windows to 3/16”s, upsized the door skins to 11/64”s. Had to redo a door skin panel as I upsized the WRONG row of holes. Be careful and drill the correct holes.


 
Dec 31, 2022     Upsizing window frame and glass holes - (2.5 hours)       Category: Fuselage
Upsized the holes in 4 stages on the window frames from 1/16th to 11/64th, upsized to 11/64th on both upper windows, need to go one more size up to 3/16th

Door skins will be next to match the frames for the #8 screws


 
Dec 30, 2022     Window Framing - (6 hours)       Category: Fuselage
Measured all the window framing pieces, marked and punched the hole locations. Drilled holes 1/16”, will upsize tomorrow. Holes in the window will be oversized for the possible changes due to temperature variation. Lots of measuring and math to get the holes evenly spaces for each framing piece


 
Dec 28, 2022     Door window frames - (3 hours)       Category: Fuselage
Used flat aluminum 1/16” to create a window frame to sandwich the window. Top swing up doors were fairly easy, bottom door was much more difficult with lots of angles. I did the top two and the bottom left door


 
Dec 11, 2022     Windows - (7 hours)       Category: Fuselage
Yesterday I picked up a lower door to begin the framing process of securing the windows in place only to notice one was cracked. Lower doors have a difficult shape and this took a good 4 hours to fit a new one. Luckily I had leftover .125 glass

Then I sanded and sanded and then sanded some more, so all windows all have super smooth edges


 
Dec 01, 2022     Inspection covers - (1.5 hours)       Category: Fuselage
Due to a less than idea fit, I redid the forward horizontal stabilizer inspection covers


 
Nov 06, 2022     Seat Belt attach points - (1 hour)       Category: Fuselage
Had to tap drill the two outside seatbelt attach points and install helicoils for the AN4 bolt as it is not possible to do a pass through


 
Nov 06, 2022     Seat Belt attach points - (1 hour)       Category: Fuselage
Had to tap drill the two outside seatbelt attach points and install helicoils for the AN4 bolt as it is not possible to do a pass through


 
Nov 02, 2022     Left side finished - (6 hours)       Category: Fuselage
Left side covering is finished, only thing left is taping the seams which will be all done at the very end


 
Oct 31, 2022     Covering the Vertical Stabilizer - (7 hours)       Category: Fuselage
Finally finished the Vertical. I used separate pieces of fabric for both right and left sides to be able to get the fabric to lay down so I could rib stitch the lowest rib.


 
Oct 20, 2022     Cut both right and left fabric and attached left - (8 hours)       Category: Fuselage
Both right and left were cut to size and lined for glue. Right side fabric was glued as was the right side fuselage. Tacked the fabric on the side stringers


 
Oct 19, 2022     Prep for covering - (4.5 hours)       Category: Fuselage
Riveted in the outer window frames and permanently set the inspection cover backing plates


 
Oct 18, 2022     Inspection Covers - (1 hour)       Category: Fuselage
Made the backing and covers for the tail feather attachements, made the covers for the forward horizontal attach location


 
Oct 18, 2022     Bottom Covering Complete - (15 hours)       Category: Fuselage
Two days and 15 hours later and the bottom of the fuselage is covered. It was pretty easy, I did need a second pair of hands for an hour or so moving the large fabric piece back and forth several times from the fuselage to the table


 
Oct 17, 2022     Prepped for Covering - (2 hours)       Category: Fuselage
Attached 2x4's to the fuselage engine mount holes to be able to rotate for covering. Removed the gear (gear since covered). Inverted to start on the bottom


 
Aug 15, 2022     Left side cargo covering - (4 hours)       Category: Fuselage
I had planned to do both the left cargo wall and left window, but life got in the way. Left cargo wall is now in.


 
Aug 12, 2022     Fitting of the skylights - (2.5 hours)       Category: Fuselage
I measured, measured, and measured, then…..

Yep today was skylight day. Right wide was perfect for width, but needed one trimming cut after the initial cut. Left side required two length trims, but both are fitted. It was surprisingly easier than I thought, I was expecting the worst with the compound curve.


 
Apr 06, 2022     Floor boards and cargo area - (2 hours)       Category: Fuselage
Used Scotch Bright to remove scratches and prepare for the carbon fiber wrap. Also re-installed the underfoot floorboard as well the fuel selector. Also brought al the floor boards and cargo closeouts home in preparation for covering


 
Apr 05, 2022     Middle section of the roof/sky light - (3 hours)       Category: Fuselage
Drilled the wholes for the GPS and Comm antennas in the metal center section of the roof over the seats. Used scotch bright to prepare the metal for paint/wrap. Upsized the drilled holes for final rivet size.


 
Apr 04, 2022     Center roof section - (3 hours)       Category: Fuselage
Cut and fit the .040 2024 T3 middle section of the roof/skylight area. Taped and drilled then upsized the holes in the support rails. Measured to get the metal fit to have equal overhangs on both the right and left, then match drilled from the middle fore and aft alternating left and right to keep everything even


 
Mar 28, 2022     Flap Cable Rub Block - (.5 hour)       Category: Fuselage
My left and right flap cables were rubbing on the upper longeron, so I installed rub blocks


 
Mar 24, 2022     Right seat bottom webbing installed - (3 hours)       Category: Fuselage
Attached the right seat bottom webbing to the frame, started fitting the right seat bottom cushion


 
Mar 23, 2022     Right Rear Window - (2.5 hours)       Category: Fuselage
Used the template to trace out, then rough cut and finally sanded and filed to fit into the window frame,


 
Mar 22, 2022     Rear Windows - (1 hour)       Category: Fuselage
Finished the rear window template and transferred the outline to the “glass”


 
Feb 12, 2022     Rear Windows - (3 hours)       Category: Fuselage
Drilled out the factory rivets of the window frames as they were on the wrong way. Drilled and match drilled the frames to the door former. Cut the angle to cover the window frame. Angle is only clamped in at this point


 
Feb 12, 2022     Re-did the left side boot cowl - (2 hours)       Category: Fuselage
I was unhappy with the fit of the original, so I re-made the left side


 
Feb 06, 2022     Right Lower Door Window - (2 hours)       Category: Fuselage
Cut and fitted the right window for the lower door. Also trimmed the front door skin to clear the boot cowl when fully open


 
Feb 05, 2022     Rudder Pedal Spring - (.5 hour)       Category: Fuselage
Changed out the rudder pedal springs to a stronger spring


 
Feb 05, 2022     Left Lower Door - (3 hours)       Category: Fuselage
Cut and fitted the acrylic for the lower door. Also trimmed the front of the door skin for clearance on the boot cowl when fully open


 
Feb 03, 2022     Rudder Cables - (2 hours)       Category: Fuselage
Finished the cables connecting the rudder pedals to the rudder cable horn


 
Jan 11, 2022     Upper Side Stringer - (1 hour) Category: Fuselage
Fabricated an angle bend of sheet metal to attach the front of the upper side stringer to the rear door former
 
Jan 11, 2022     Skylight - (1.5 hours)       Category: Fuselage
Permanently riveted the skylight to the fuselage


 
Jan 08, 2022     Golf Club cargo tube - (3.5 hours)       Category: Fuselage
I used kydex for the container, and 2024 T-3 for the base of the “tube” to hold it secure to the fuselage.


 
Jan 08, 2022     Mouse Trap doors - (5 hours)       Category: Fuselage
Lots of trial and error fitting the piano hinges, took a few attempts to get each one correct. The actual trap doors each took two attempts to get the right fit.


 
Jan 05, 2022     Upper D Category: Fuselage
 
Dec 28, 2021     Lower doors - (3 hours)       Category: Fuselage
Drilled and cut the patroller window on the right lower door as well as trimmed the top of the side skin at the front and back for both the right and the left doors so allow the doors to fully shut. Drilled the door latch holes in the door frame for both left and right doors.


 
Dec 22, 2021     Lower Door top fitting - (.5 hour)       Category: Fuselage
Cut aluminum angle to fit on top of the lower door


 
Dec 22, 2021     Lower Door Windows - (6.5 hours)       Category: Fuselage
Cut frame for window/acrylic. Cut and fitted the acrylic to fit inside the frame, then cut and fitted the backing to hold the acrylic in the frame and to the door skin.


 
Dec 16, 2021     Rear Window frames - (.5 hour)       Category: Fuselage
Re-installed the window frames and started to bend the supports to make a clean line to work with the covering.


 
Dec 16, 2021     Door Skin - (3.5 hours)       Category: Fuselage
Mounted the skins on each door, this took some cutting and filing to get the proper clearance for the door hinges. Spent a good 2 hours exploring a way to have a patroller window in the door.


 
Dec 15, 2021     Hung Doors and Windows - (1.5 hours)       Category: Fuselage
Had to ream the holes and then flatten one side of the pin head for clearance


 
Dec 14, 2021     Sky Light and Window Former Painting - (2.5 hours)       Category: Fuselage
Had to drill out the rivets on the front window retainer to remove. Used two coats of etching primer and then two coats of black satin paint on the sky light and front window former.


 
Dec 14, 2021     Stringers - (1.5 hours)       Category: Fuselage
Riveted in the left and right side stringers, all stringers are now riveted in. Required some upsized drilling to fit the pull rivets.


 
Dec 12, 2021     Ski/Golf Club compartment - (1 hour)       Category: Fuselage
Got started on the specialized baggage compartment for skis and golf clubs. I am using Kydex and forming it with a heat gun.


 
Dec 02, 2021     Sky Light and windshield attach area       Category: Fuselage
Had to drill out the temporary rivets for the skylight frame and the windshield attach at the front. Everything was then drilled to size, match drilled and the skylight frame cleco'ed back in. I did rivet in the top windshield attach area, but it will be coming back out as I decided to paint all of these pieces black


 
Dec 02, 2021     Door Formers - (5 hours)       Category: Fuselage
Drilled out the temporary rivets and removed the door formers. Drilled the tabs and them match drilled the tab holes to the formers. Countersunk the holes for flush riveting. Installed the formers with clecos and then riveted them in. There were some tight fits for the bucking bar, but I managed to get them all in. There were some that were drilled out and re-riveted to make them perfectly flush


 
Dec 02, 2021     Bottom Stringers - (4 hours)       Category: Fuselage
The bottom stringers require bending so as to allow the fabric to transition to the tail without an edge.


 
Dec 02, 2021     Stringers Pt. 1 - (4 hours)       Category: Fuselage
Rough cut to lengths then fit and trimmed to perfect length. Lots of filing and sanding of the ends to make sure nothing has a chart edge. No holes drilled yet, just all fitting and then clamping in place


 
Dec 02, 2021     Seat Adjustment mechanism - (5 hours)       Category: Fuselage
This was a long arduous process of drilling the holes for the seat adjustment. There was a lot of measuring and re-measuring in the seat frame bottoms. The actuating arm which holds the seats required a bit of fitting as well


 
Dec 02, 2021     Window - (3 hours)       Category: Fuselage
The window frames came nicely drilled for the attach points, Drilled the tabs and cleco'ed in the windows temporarily. October 1


 
Dec 02, 2021     Delivery - (5 hours)       Category: Fuselage
Taking delivery required a few people out offload things and get everything Stowe din the hanger. Fuselage was put on sawhorses to protect the bottom stringer attach points. Several hours were spent removing plastic and bubble wrap


 