EAA Builders Log Website
EMail address:
Password:
- Lost my password
close
EAA Builders Log
(An EAA website).
Help
Contact Us
About
Sign Up
Login
Project:
Sean
-
Listing for Category : instrument panel
(Please mouse-over any icon to get a description of that function).
Categories
Show All Entries
- (72)
Avionics
- (6)
Canopy
- (4)
Controls
- (1)
Empennage
- (3)
Engine
- (1)
Firewall
Fuel System
- (1)
Fuselage
Inspection
- (1)
Instrument Panel
- (3)
Interior Finish
- (4)
Landing Gear
- (4)
Lighting
- (3)
Paint / Decals
Propeller
- (1)
Research
- (2)
Tail Feathers
Tools
Wings
- (6)
Workshop
- (3)
Engine Cowl
- (3)
Filter Box
- (1)
Oil Cooler
- (3)
Plenum
- (1)
Wiring
- (7)
Baffling
- (3)
Smoke System
- (1)
SCAT Hoses
- (1)
Fiberglass
- (2)
General
Testing
- (4)
Battery
- (1)
Training
- (2)
Builder Name:
Sean Blair
-
Project:
Vans - RV-7
-
VIEW REPORTS
Total Hours:
263
Total Flight Time:
14
Total Expense:
N/A
Start/Last Date:
Oct 01, 2012 - No Finish Date
Engine:
Aerosport IO-375 Vertical Induction, Low Compression, 195 HP
Propeller:
Hartzell CS
Panel:
Garmin G3X Touch
Friendly URL:
https://eaabuilderslog.org?s=Sean
Home or Last Project Picture
Jun 23, 2019
Powered Panel
- (5.5 hours)
Category: Instrument Panel
Spent time cleaning up wiring, taesting some connections, and applying power to the panel. Very happy with how this looks and is laid out. Steep learning curve for me.
Panel, pilot side.
Panel, PAX side.
Oct 09, 2017
Fitting Carbon Panel
- (3.2 hours)
Category: Instrument Panel
Continued working on the carbon panel. Getting a nice fit.
Carbon Panel.jpg
Aug 30, 2013
Framework
- (3.2 hours)
Category: Instrument Panel
More work fitting the sub-frame for the carbon panel. This is beginning to get sturdy.
panel55.jpg
panel56.jpg
panel58.jpg
panel59.jpg
NOTE: This information is strictly used for the EAA Builders Log project within the
EAA organization
.
-
Policy
-
© Copyright 2024 Brevard Web Pro, Inc.