EAA Builders Log Website
EMail address:
Password:
- Lost my password
close
EAA Builders Log
(An EAA website).
Help
Contact Us
About
Sign Up
Login
Project:
nburkholder
-
Listing for Category : controls
(Please mouse-over any icon to get a description of that function).
Categories
Show All Entries
- (334)
Research
Workshop
- (5)
Empennage
- (49)
Fuselage
- (131)
Firewall
- (10)
Tail Feathers
Wings
- (32)
Controls
- (1)
Avionics
- (25)
Lighting
- (2)
Instrument Panel
- (8)
Landing Gear
- (8)
Engine
- (36)
Propeller
- (2)
Fuel System
Interior Finish
Paint / Decals
Inspection
- (2)
Tools
Wiring
- (23)
Builder Name:
Nancy Burkholder
-
Project:
Vans - RV-9
-
VIEW REPORTS
Total Hours:
1181.4
Total Flight Time:
Total Expense:
$2.00
Start/Last Date:
May 14, 2022 - No Finish Date
Friendly URL:
https://eaabuilderslog.org?s=nburkholder
Home or Last Project Picture
Oct 01, 2023
Move pilot stick switch wiring
- (1 hour)
Category: Controls
Move the wire bundle from the pilot stick switch to exit from the side of the stick above the pivot rather than exit at the bottom. Route the wire bundle through the floor rib to the bay holding the trim relay.
IMG_9449.jpeg
NOTE: This information is strictly used for the EAA Builders Log project within the
EAA organization
.
-
Policy
-
© Copyright 2024 Brevard Web Pro, Inc.