EAA Builders Log Website
EMail address:
Password:
- Lost my password
close
EAA Builders Log
(An EAA website).
Help
Contact Us
About
Sign Up
Login
Project:
nburkholder
-
Listing for Category : landing gear
(Please mouse-over any icon to get a description of that function).
Categories
Show All Entries
- (334)
Research
Workshop
- (5)
Empennage
- (49)
Fuselage
- (131)
Firewall
- (10)
Tail Feathers
Wings
- (32)
Controls
- (1)
Avionics
- (25)
Lighting
- (2)
Instrument Panel
- (8)
Landing Gear
- (8)
Engine
- (36)
Propeller
- (2)
Fuel System
Interior Finish
Paint / Decals
Inspection
- (2)
Tools
Wiring
- (23)
Builder Name:
Nancy Burkholder
-
Project:
Vans - RV-9
-
VIEW REPORTS
Total Hours:
1181.4
Total Flight Time:
Total Expense:
$2.00
Start/Last Date:
May 14, 2022 - No Finish Date
Friendly URL:
https://eaabuilderslog.org?s=nburkholder
Home or Last Project Picture
Dec 08, 2023
Right Gear Leg Fairing
- (4.5 hours)
Category: Landing Gear
Fabricate right gear leg fairing fitting hinge, drilling, countersinking, and riveting hinge halves to gear leg fairing. Test tit engine rubber shock absorbing mounts to engine mount.
IMG_9674.jpg
IMG_9675.jpg
IMG_9676.jpg
Dec 06, 2023
Complete Left Landing Gear Fairing
- (3 hours)
Category: Landing Gear
Rivet one hinge half to the left landing gear fairing. Drill, countersink, and deburr the opposite hinge to the gear leg fairing. Rivet the hinge to the gear leg fairing. Fabricate a replacement left brake line.in order to fit better with fairing.
IMG_9671.jpg
IMG_9673.jpg
Dec 03, 2023
Start Gear Leg Fairing Fabrication
- (4 hours)
Category: Landing Gear
Trim gear leg fairing. Mount fairing to left gear leg and drill one hinge to faring. Machine countersink hinge attach rivets. Deburr hinge. Ready to set rivets.
IMG_9665.jpg
Nov 26, 2023
Fabricate Left Brake Line
- (2 hours)
Category: Landing Gear
Fabricate and install left brake line from firewall to left caliper. Need 3/8" plastic tubing fto complete attaching brake line to gear leg.
IMG_9650.jpg
IMG_9651.jpg
Nov 25, 2023
Fabricate Right Brake Line
- (4 hours)
Category: Landing Gear
Fabricate right brake line from firewall to right brake caliper. Drill holes for three nut plate attach points for Adel clamps.
IMG_9644.jpg
IMG_9645.jpg
IMG_9646.jpg
Nov 24, 2023
Attach Right Brake
- (1.5 hours)
Category: Landing Gear
Mount right brake and wheel pants mounting bracket to right landing gear leg.
IMG_9642.jpg
Nov 23, 2023
Mount Left Brake
- (2 hours)
Category: Landing Gear
Attach left brake and wheel fairing mount to gear leg.
IMG_9641.jpg
Nov 19, 2023
Attach engine mount and landing gear
- (3 hours)
Category: Landing Gear
Attach the engine mount to the fuselage. Attach the landing gear legs to the engine mount. Temporarily place tires on the axles.
IMG_9638.jpg
NOTE: This information is strictly used for the EAA Builders Log project within the
EAA organization
.
-
Policy
-
© Copyright 2024 Brevard Web Pro, Inc.