Project: nburkholder   -  
            Listing for Category : landing gear
    (Please mouse-over any icon to get a description of that function).


  
Builder Name:Nancy Burkholder   -  
Project:   Vans - RV-9   -   VIEW REPORTS
Total Hours:1181.4
Total Flight Time:
Total Expense:$2.00
Start/Last Date:May 14, 2022 - No Finish Date
 
Friendly URL: https://eaabuilderslog.org?s=nburkholder

Home or Last Project Picture

Dec 08, 2023     Right Gear Leg Fairing - (4.5 hours)       Category: Landing Gear
Fabricate right gear leg fairing fitting hinge, drilling, countersinking, and riveting hinge halves to gear leg fairing. Test tit engine rubber shock absorbing mounts to engine mount.


 
Dec 06, 2023     Complete Left Landing Gear Fairing - (3 hours)       Category: Landing Gear
Rivet one hinge half to the left landing gear fairing. Drill, countersink, and deburr the opposite hinge to the gear leg fairing. Rivet the hinge to the gear leg fairing. Fabricate a replacement left brake line.in order to fit better with fairing.


 
Dec 03, 2023     Start Gear Leg Fairing Fabrication - (4 hours)       Category: Landing Gear
Trim gear leg fairing. Mount fairing to left gear leg and drill one hinge to faring. Machine countersink hinge attach rivets. Deburr hinge. Ready to set rivets.


 
Nov 26, 2023     Fabricate Left Brake Line - (2 hours)       Category: Landing Gear
Fabricate and install left brake line from firewall to left caliper. Need 3/8" plastic tubing fto complete attaching brake line to gear leg.


 
Nov 25, 2023     Fabricate Right Brake Line - (4 hours)       Category: Landing Gear
Fabricate right brake line from firewall to right brake caliper. Drill holes for three nut plate attach points for Adel clamps.


 
Nov 24, 2023     Attach Right Brake - (1.5 hours)       Category: Landing Gear
Mount right brake and wheel pants mounting bracket to right landing gear leg.


 
Nov 23, 2023     Mount Left Brake - (2 hours)       Category: Landing Gear
Attach left brake and wheel fairing mount to gear leg.


 
Nov 19, 2023     Attach engine mount and landing gear - (3 hours)       Category: Landing Gear
Attach the engine mount to the fuselage. Attach the landing gear legs to the engine mount. Temporarily place tires on the axles.


 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.