Jan 25, 2024     Mount Left Cable Raceway - (1 hour)       Category: Wiring
Similar to the right side cable raceway, mount a raceway on the left fuselage upright post to route wiring from the left side of the instrument panel to aft locations. Place a section of raceway along the floor to route the wiring from the post to forward of the main spar. The final location for the floor mounted raceways will be determined when installing floorboard carpets.


 
Jan 23, 2024     Mount Cable Raceway - (1 hour)       Category: Wiring
Rivet cable raceway to upright post on right side of fuselage to channel wires from the instrument panel routed to aft locations. The raceway cover is removable and I've used tape to temporarily contain the wires while evaluating the overall installation. Lay in place a raceway to route wires along the floor from the support to forward of the main spar. Replace tape with raceway cover.


 
Jan 20, 2024     Update Secondary Battery Wiring - (4 hours)       Category: Wiring
Add #18 shielded wire to battery plus cable and attach shield to batter negative terminal. Run shielded wire to fuse block on subpanel and connect to two fuses. One fuse for the transponder keep alive and the other fuse for power to the right Lightspeed ignition. Reconnect battery shunt sense cables to fuse block. Attach Transponder keep alive lead to fuse block.


 
Dec 21, 2023     Wire Starter Motor and Engine Ground - (3 hours)       Category: Wiring
Attach power cable from starting solenoid to starter motor. Add Adel clamps for support. Attach grounding strap from engine to negative battery terminal.


 
Dec 19, 2023     Remove all wiring to Garmin Avionics - (2 hours)       Category: Wiring
My original wiring did not have as much slack at the connectors that I felt was needed. Also, the CAN bus has an intermittent connection. Remove all Garmin bus wiring at instrument panel. I will rewire the avionics in the coming months.


 
Nov 06, 2023     Verify bus wiring - (3 hours)       Category: Wiring
Verify remaining primary and secondary avionics bus power wiring. Run CAN bus to terminal block at right wing attach location to service the roll servo. Trim wire from ELT to ELT annunciator and attach 6P4C connector to wire. Attach wire to annunciator.


 
Nov 05, 2023     Verify fuse block wiring - (1 hour)       Category: Wiring
Verify avionics primary and secondary fuse block wiring.


 
Nov 03, 2023     Begin Wiring Checkout - (2 hours)       Category: Wiring
Verify wiring for primary master contactor, secondary master contactor, and avionics master switch. Verify primary and secondary power, and ground for both G3X displays.


 
Oct 20, 2023     Complete Fly LEDs wiring - (2 hours)       Category: Wiring
Complete wiring to Fly LEDs controller board. Mount ELT annunciator to subpanel.


 
Oct 18, 2023     Wiring at Fly LEDs Board - (2 hours)       Category: Wiring
Reattach wiring to Fly LEDs board. Attach left and right switches from Pilot control stick to terminal board connecting to the elevator trim relay. Connect elevator trim motor to trim relay. Connect delevator autopilot disconnect to left and right Pilot control stick. Connect Pilot PTT from panel to Pilot control stick PTT button.

Items to be completed:
CoPilot PTT,
roll servo autopilot disconnect,
grounds from trim relay deck and Pilot control stick to local airframe ground.


 
Oct 16, 2023     Wire rerouting at Fly LED board - (2 hours)       Category: Wiring
Initial routing of wires to Fly LED control board and trim relay had room for improvement. Route wires to the Fly LED control board through forward floor ribs. Route wires to the trim relay through a separate grommet hole in the center tunnel rib at the aft end of the control board. Wires rerouted and ready for connection.


 
Oct 15, 2023     Wiring cleanup - (3 hours)       Category: Wiring
Replace in-line fuse for primary Lightspeed Ignition with fuse block mounted to firewall. Reroute wire bundle to firewall passthrough and add Adel clamps to stabilize run. Add Adel clamp to sensor wires routed out from the firewall passthrough.


 
Oct 14, 2023     Mount Terminal Blocks - (3 hours)       Category: Wiring
Mount terminal block to subpanel to terminate wires from the ELT, power, and GPS input from GDU. Mount terminal block to firewall to terminate wires from the EMS for fuel flow and oil temperature sensors.


 
Oct 10, 2023     Elevator Trim Circuit Breaker - (1 hour)       Category: Wiring
Install 1A pull able circuit breaker for elevator trim. Run power from circuit breaker to the floor where the trim relay is mounted.


 
Sep 22, 2023     More wiring - (4 hours) Category: Wiring
Wire B&C primary power voltage regulator sense wire to main fuse block and pitot heat power from panel circuit breaker to terminal block near fuselage left wing. Wire Fly LEDs controller board for left wing (position lights, wing strobes, and landing lights) to terminal block near fuselage left wing. Wire strobe, landing light power from panel, and wig wag signal from panel to controller board.
 
Sep 21, 2023     More Wiring - (4 hours)       Category: Wiring
Mount secondary power shunt to subpanel and splice in series with power from secondary battery. Add shunt sensor wiring and fuse blocks. Connect primary and secondary shut sensors, Light Speed tach signals, and wiring for fuel flow, fuel pressure, oil pressure, oil temperature, and manifold pressure to GEA 24 engine monitor. Mount sensor manifold to firewall.


 
Sep 17, 2023     Subpanel wiring - (4 hours)       Category: Wiring
Wire both Lightspeed "P-leads" to the keyed ignition switch. Mount the B&C voltage regulator to the subpanel and wire supply pins to the primary master field switch field and then to the primary fuse block.


 
Sep 10, 2023     Fabricate terminal strip mount - (6 hours)       Category: Wiring
Fabricate mounting for two 10 position barrier terminal strips, mounted near the main spar on the left and right sides. Wire the position and strobe light wires from the Fly LEDSs controller to the right wing barrier strip. Wire the power leads to the left Lightspeed module to the front panel circuit breaker.


 
Sep 08, 2023     LIghtspeed ignition wiring - (4 hours)       Category: Wiring
Mount pre-made cable attaching power and the mini crank sensor to both Lightspeed ignition modules. The sensor connectors fit through the firewall penetrations without the back shells. Shield the sensors on the engine side of firewall with bubble wrap for protection until ready to mount to engine. Attach elevator trim tab position wires and two fuel level sensor wires to the GEA 24 engine monitor.


 
Sep 03, 2023     GPS keep alive fuse - (1 hour)       Category: Wiring
Mount a single fuse block from the secondary battery for GTX 335 GPS keep alive pin.


 
Aug 29, 2023     Flap & ELT Power - (3 hours)       Category: Wiring
Connect ELT to main bus fuse block. Run wire from flap motor location forward and up to the flap switch on the instrument panel. Wire flap switch to allow reversing the flap motor direction. Connect flap power to main fuse block. Add nutplates to subpanel to attach two Adel clamps for holding wire coming up from the floor along the fuel vent lines on the left and right side.


 
Aug 13, 2023     Primary Bus Wiring - (8 hours)       Category: Wiring
Wire system power from load side of master contactor to 4 post terminal block. Connect avionics master relay to terminal block. Fabricate mounting bracket for primary power fuse block. Install nut plates in fuselage stringer for attachment. Update schematic and fuse block and switch list to correlate with latest design.


 
Aug 13, 2023     Power wiring - (8 hours)       Category: Wiring
For both Lightspeed ignition power wiring, connect the braid directly to the corresponding primary and secondary batteries. Add a wire to the secondary battery Lightspeed power to supply power for GTX 335 keep alive. Fabricate a bracket and install a relay to control power to the avionics primary bus controlled by a panel mounted avionics master switch. Fabricate a bracket to hold a 4 terminal bus connection that will distribute power from the primary battery to the avionics primary bus and the primary power bus (anything not connected to primary or secondary avionics bus).


 